OBJECTIVE
To secure a position as a “CONTRACT/TEMPORARY” Facilities Project Engineer with a progressive organization, where my experience, training, and education may be utilized to its fullest.
SUMMARY
I have 35 years of documented success in varied facility positions in diverse industries. My extensive experience includes supervision of in-house and subcontract construction personnel. I possess excellent interpersonal skills.
PROFESSIONAL EXPERIENCE
HAWKER BEECHCRAFT, Wichita, Kansas 2004-2009
Product Support Specialist
• Created complex office, lab and manufacturing layouts for construction and relocation.
• Oversaw the creation and development of the Security Department Upgrade.
• Oversaw the creation and development of all plant warehouse facilities.
• Created and assisted in the construction of a 600,000 Sq. Ft. Logistics Center
• Was responsible for all office rearrangements from planning to completion
• Developed CATIA Computer Design basics.
• Revised and updated master layouts.
HI TECH ASSOCIATES INC., Lakeland, Florida 2003-2004
Layout Engineer (Consultant) to Lockheed Martin
• Created complex office, lab and manufacturing layouts for construction and relocation.
• Oversaw the creation and development of the Atlas Program Area.
• Redeveloped INTERGRAPH Computer Design basics.
• Revised and updated master layouts.
RAYTHEON AIRCRAFT COMPANY, Wichita, Kansas 1995-2001
Facility Planner III
• Produced detailed office, lab, and manufacturing layouts throughout the complex and coordinated the development from start to completion with up to 10 to 50 subcontract personnel.
• Developed relocation coded layouts of the area and supervised a 5 to 15 subcontract move team.
• Developed CADAM Computer Design basics.
• Revised and updated master layouts.
BOEING COMPANY, Renton, Washington 1990-1995
Facilities Plant Planner
• Created office, lab, and manufacturing layouts, and supervised a 10 to 50 in-house or subcontract construction team throughout the modification phases.
• Generated relocation coded layouts, and guided a 5 to 15 in-house or subcontract move personnel through rearrangement.
• Performed minor estimate of the proposed task.
• Assisted in the development of the 20-man on and off-site utility shutdown Committee. I was also a member of the program.
• Developed ISICAD Computer Design basics.
• Revised and updated master layouts.
Michael J. Nickles Page Two
GENERAL DYNAMICS CORPORATION, Pomona, California 1982-1990
Project Engineer
• Produced office, lab, and manufacturing layouts. Led a group of approximately 10 design engineers in the development of the area to be modernized.
• Prepared the rearrangement plan of action and, led a 10 to 15 construction team during development.
• Revised and updated facility master layouts.
• Prepared detailed reports regarding available facility space.
• Successfully transferred a F16 fighter jet, via street access, from S...
Login or Register to view the full resume.