EDUCATION:
Masters of Industrial Technology Engineering, Cal State Univ., LA
BS Electrical Engineering, Cal State Univ., LA
Research Fire Life Safety Systems
LICENSES AND CERTIFICATES ACG Certified
Certificate of EMS Controls and HVAC, Trane
Certificates of EMS Controls, Johnson Controls
Certificate of State Fire Marshal, CA
Certificate of Fire Life Safety, Johnson Controls
Licenses Fire Protection Engineering Technology NICET , Virginia
Certificate Intermediate Fire Alarm Inspection and Testing, AFAA
QUALIFICATIONS: During tenure with TestMarcx, I have had the opportunity to utilize a wide range of existing skills and knowledge as well as to widen my scope of specialty. I act as an on site-commissioning engineer, conducting installation observations, system functional testing, and contractor coordination meetings.
I have an extensive background in BMS and Fire systems. I have worked as project manager for several major controls manufactures to design, plan and commission controls system installations on varied mechanical system types of schools, colleges, hospitals, commercial and government office buildings.
I have experience working with fire, security, complex HVAC systems, chillers, boilers, fume hoods, as well as all associated controls. I am knowledgeable with other specialized systems including but not limited to specialty fire and smoke control systems. I have 12 years experience managing & coordinating all aspects of HVAC controls and fire life safety systems.
NOTABLE PROJECT EXPERIENCE:
Cathedral City High School Chiller Plant, LA
Santa Monica School District, LA
Riverside Unified School District, Riverside
LA Unified School District , LA
UCLA CNSI, LA
Santa Monica VA Hospital, LA
Long Beach VA Hospital, LA
San Diego State Univ., Bioscience Bldg TI
City of Hope Duarte Medical Office Bldgs, LA
St Vincent Medical, LA
St Joseph Medical Center, LA
Boeing, El Segundo, LA
John Wayne Airport, Irvine
March Air Force Base, Riverside
Loyola Marymount Univ. Student Center, LA
Loma Linda Univ. Lindsay Hall, LA
Kaiser Permanente Hospital, LA
Northrop Grummen, El Segundo
New Otani Hotel, LA
Hyatt Long Beach, Long Beach
Warner Brother Office Building, LA
Commerce Casino, LA
Hustler Casino, LA
Poway Unified School District, SD-CA
Cuyamaca Community College, SD
Grossmont Community College, SD-CA
Hollenbeck Police Station, LAPD
Metro Detention Center, LAPD
Rampart Police Station, LAPD
Harbor Police Station, LAPD
Metro Detention Center, LAPD
Emergency Operation Center, LAPD
San Diego College P Bldg, SD
New Otani Hotel, LA
Mira Mar College, SD
Laguna Honda Hospital, SF-CA
US Apraiser, SF
Morgan Hill Court House, SJ-CA
Caltech Univ., Annenberg Building, LA
UCLA – CIS Building
University California Santa Barbara, SB
Santa Clara Water District, SJ- CA
29th Palm Marine Base
Agua Caliente Casino, Palm Spring-CA
IBM 600 Anton, Costa Mesa CA
Walgreens Mira Mesa, SD-CA
Miramar College Tech Bldg, SD-CA
Cuyamaca College Bus & Tech Bldg, SD-CA
Miramar College Art & Humanities , SD-CA
Allsteel Gunlocke, Santa Monica – CA
Cedar Sinai Steven Spielberg Bldg, LA
Cedar Sinai New Chiller, LA
KSEA TI, El Segundo - CA
WORK EXPERIENCE:
TMCx California Inc. 03/2007 – 03/19/2010
Commissioning Engineer - Responsible for the application of the commissioning process used by TestMarcx for new commissioning projects, retro-commissioning projects, continuous commissioning projects, and forensic engineering projects. Assist Senior Engineers & Project Managers in implementing strong functional commissioning processes and procedures.
American Standard Company
Trane Contracting Control Technician 01/2006 – 03/2007
Under general direction, I was responsible for on-site project coordination: programming, commissioning, executing HVAC and Energy Management systems. I conduct system inspection on industrial, commercial, government, school facilities for the Tracer Summit System.
Johnson Controls, Inc Lead System Specialist (Project Manager) 05/2005 – 12/2005
Under general direction, I was the on-site project leader responsible for planning, executing, and project close out of HVAC controls systems. Each project included hardware design, system programming, installation coordination, system and network commissioning and project closeout. Responsible for the financial results of assigned projects including: costs; project billing; maintained an effective bal...
Login or Register to view the full resume.