Education Bachelor of Science - Computer Information Systems
Chapman College Orange, CA Feb. 1989, 3.46 GPA
Associate of Science - Mathematics
Victor Valley College Victorville, CA June 1984, 3.12 GPA
Employment Summary
10-11 to present Amazon Seattle, WA
Fiber optic design for dark fiber and Amazon owned fiber. CloudFront data center engineering of space, power and connectivity in USA and Europe. Negotiate contracts for all work. SME for all fiber projects.
3-11 to 10-11 Conterra Broadband Services Charlotte, NC
Engineer aerial and buried fiber optic cable for projects across the USA. Prepared SOW, material list, cost estimate and Visio drawings. Plan, coordinate, and manage pre-construction and post-construction activities. Manage Worked with facility based CLEC's to extend fiber reach to customer locations.
4-07 to 11-10 Clearwire Corp Kirkland, WA
Engineered collocation space, DC and AC power, fiber connectivity, DS1/DS3/OCn, Dark Fiber and Ethernet transport within a market and transport access to Regional Data Centers.
Worked with multi-team to install equipment, negotiated MSA, SLA and pricing for collocation and transport services including design of DWDM. Ordered IP and TDM circuits for transport and DIA IP,
used ClearVision database to document work. Prepared Visio and AutoCAD drawings to detail network connectivity.
1/96 to 3/07 Sprint/Nextel Communications Federal Way, WA
Network Optimization Engineer 1-06 to 4-07
Optimized and designed all BSC and iBSC equipment in the PNW Market. Analyzed traffic and changed system parameters to reduce PCCH, location up dates and pages requests.
Determine BSC, ILA, DLA and PDR for all new cell sites. Responsible for cell site dispatch bandwidth settings for West Region including Mexico and Hawaii.
Collected data from OMC to populate and utilize iNOTS planning tool.
Sr. Interconnect Engineer 7-97 to 1-06
Designed and implemented Washington, Oregon and Idaho network using MW radio, DS1, DS3, DWDM and optical UPSR and BLSR facilities. Negotiated pricing for all transport services.
Designed Linx, Alcatel and Harris MW radio systems for cell sites as required. Ordered circuits for cell sites, PSTN, E911, 411, SS7 and all DS3 and higher rates.
Designed circuit connections into Alcatel 1631 and 1630 DACS to interoffice equipment and Nortel DMS250 Switch. Tested DS3 and optical circuits using TBERD, Centest and TCOM.
Trained technicians on provisioning circuits on TDM mux and DACS. Responsible for all DACS expansions and database integrity in West Region.
Responsible for 18-month capacity plan for Pacific Northwest area for vendor optical rings, MSO and remote DACS's and internal SONET rings. Documented all work in TBS database system.
Engineered all DACS additions for West Region. Worked with appropriate departments to order, install and turn up equipment. Entered all DACS and related equipment into TBS database.
Worked with Tellabs 5500, 5320 and Alcatel 1631 SMC, LMC and 1630. Reported utilization reports monthly and quarterly equipment forecast.
Sprint PCS Bellevue, WA 1/96 to 7/97
Transport Engineer
Designed and implemented network linking cell sites in Western Washington MTA. Wrote testing plan for all digital facilities terminating in #5ESS ECP and Switch Modules.
Ordered and tracked all cell site DS1s and DS3s. Implemented and designed cell site and PSTN cross-connect assignments from #5ESS switch to Tellabs 532L and 5500S DCS connecting
to CLEC and LEC SONET networks. Engineered Tellabs 532L and 5500S DCS and Telecom Solutions timing equipment. Negotiated pricing for all transport services. Designed Access database
to track cell site and PSTN cross-connects, packet pipe and switch module assignments. Reconfigured cell site packet pipes as needed. Tested DS1 and DS3 circuits using HP 156 IMT
and TCOM 440B T-ACE test sets.
1/95 to 1/96 Kansas City FiberNet Kansas City, MO
Network Engineer
Designed FT2000 OC-48, DDM2000 OC-12 and OC-3 SONET systems on dual ring topology. Designs included STS mapping, equipment configuration, alarming, power, cable management and
space requirements and equipment ordering. Engineered customer and OC48 hub sites for conduit, dual fiber entrances and power meeting National Electrical Safety, state and city standards.
Responsible for network planning and configuration plans. Produced all engineering drawings in AutoCAD.
US WEST Communications Seattle, WA 3/93 to 1/95
Instructor - Training, Network & Technology Services Design Lab
Taught classes on DS1 and DS3 testing using TBERD 209A/211/310 and TCOM 440B T-ACE test sets using AT&T D4 channel banks, Telecom Solutions DCD400, AT&T and Fujitsu SONET muxes,
Tellabs ...
Login or Register to view the full resume.