PROFILE:
1. Dynamic twelve year engineering career reflecting driven performance,
experience and achievements in manufacturing environment
2. Experience includes Process Automation, Building Maintenance, Utilities
and Validation
3. Successful project manager of various small and large capital
Automation and Facilities projects
4. Well organized with track record demonstrating motivation and
initiative to achieve both personal and company goals
5. Highly dedicated in problem identification, resolution and optimization
to satisfy business needs.
________________________________________________________________________________
EXPERIENCE:
SYRACUSE, NY 2002 - Present
Automation Engineer 2007 - Present
1. Co-Project Lead for $5.0M Emerson DeltaV Distributed Control System
implementation and qualification for upstream processing and building
utilities systems
2. Managed $3.0M Emerson DeltaV implementation and qualification project
for downstream processing suite
3. Programmed Emerson DeltaV and ABB Control System platforms for seven
product campaigns in upstream and downstream processing suites
4. Mentor two junior process automation engineers providing and
encouraging continual evaluation and performance improvement of
automation projects
5. Author Control System and PLC Computer Life Cycle Documentation
including design specifications, qualification test plans,
commissioning test plans, risk assessments and trace matrix
6. Supervise external resources on programming, system specification
documentation and qualification to ensure best practices
7. Designed control system monitoring in DeltaV and ABB Control Systems
for trending and alarm notification on system health issues.
8. Implemented HVAC control system interface providing real-time
monitoring, alarming and historical trending of HVAC data for ISO
classified spaces.
Facilities Engineer 2004 - 2007
1. Successfully scheduled the 2006 and 2007 annual production
shutdown to coordinate cleaning, preventive and corrective maintenance,
equipment / computer validation activities and capital project
improvement
2. Facilities cleaner supervisor with management of six employees and one
contract employee for daily building cleaning activities
3. Implemented optimization strategy on seven point-of-use heat exchangers
to reduce daily water waste by 900 gallons / day
4. Developed optimization strategies to reduce flushing waste by 50% on
water generation skids operation
5. Root cause investigations on building and utility system failures,
including CAPA creation and resolution.
Assistant Validation Engineer 2002 - 2004
1. Utilities validation team lead including supervision of three employees
including scheduling, coordination and execution of utilities
qualification studies.
2. Qualification of utilities and production equipment, including
Installation Qualification, Operational Qualification and Performance
Qualification. Authored quality documentation.
3. Created Re-validation Assessment program to evaluate effectiveness of
existing equipment and utilities systems qualifications to determine
necessary re-validation
HANFORD PHARMACEUTICALS SYRACUSE, NY 2001-2002
Process Control Technol...
Login or Register to view the full resume.