EDUCATION
M.Sc, Energy Future (Oil and Gas Engineering) - University of Aberdeen, Sept. 2007 – Sept. 2008
Main Subjects:
• Geosciences in Exploration and Production
• Getting Oil out – Engineering from Borehole to Surface
• Project Management and Group Project
• Issues in Oil and Gas Enterprises Management
• Safety Engineering and Risk Management
• Dissertation: Flow Assurance: Mitigation of Blockages in Sub-sea Flowlines, 2008
B.Eng, Chemical Engineering - Enugu State University of Science and Technology, 1997–2002
Main Subjects:
• Chemical Plant Design, Separation Techniques and Reaction Engineering
• Petroleum Refining and Processing
• Chemical Process Optimization, Thermodynamics, Petroleum Engineering
• Engineering Management and Company Law
• Dissertation: Design of Production Plant that will Produce 2.7 Metric Tones of Butyl Alcohol per annum, 2002
TRAINING, RESEARCH AND SEMINARS ATTENDED
• Certificate in gas handling, conditioning and processing by Dr Maurice Stewart- Aug. 2006
• Certificate in piping and pipeline engineering by Dr O.T. Lewis- July 2006.
• Certificate in liquid hydrocarbon and water treatment by Dr Maurice Stewart- July 2006.
• Certificate in process control and instrumentation by Dr Maurice Stewart – Aug. 2006.
• Training on data/document control practices-a project model, 2005
• Certificate in industrial/ oil field health, safety and environmental management- April 2003
• Team leader: workshop training on health/safety under Federal Road Safety Commission FRSC/RSC Damaturu Yobe state 2003
PROFESSIONAL MEMBERSHIP
Energy Institute, UK
TECHNICAL SKILLS
• High proficient in Microsoft excel, Microsoft word, Power point etc.
• High proficient in AutoCAD, Microstation, HYSYS and PIPSIM etc.
• Excellent in presentation, report writing, good oral and written communication skills.
• Excellent in team work and ability to meet deadline.
• High mental drive, motivation ability and can work under pressure.
WORK EXPERIENCE
Contract Staff to Compact Manifold & Energy Services Ltd. Lagos, Nigeria
Position: Senior Process Engineer - Oct.2008 to date
I continue with the basic and detailed engineering design of NIPP LOT 3 Gas Transmission Pipeline and Metering Station project. Major task involve the sizing of gas pipeline running from ADDAX Platform in ADANGA North to Calabar metering station, reviewing the filter-separator, PSV, P&ID and PFD to comply with API 14C, data sheet preparation and report writing etc.
Compact Manifold & Energy services Ltd/Albert Garaudy and Associates Inc. Lagos, Nigeria
Position: Process Engineer - Oct.2005 – Aug. 2007
I have worked in several projects that involved conceptual design, FEED and detailed design of production platform, utility system, injection system, flare system, NGL and LPG extraction system etc. The major task undertaken includes: hydraulics calculation, sizing several gas flow lines, liquid flow lines and multiphase lines, two phase and three phase separator sizing, scrubber sizing, KOD sizing, compressor sizing, TEG dehydrator sizing, relief valve sizing, pump sizing and calculation, coalescer and heater design, simulation using HYSYS and PIPESIM, drafting P&IDs and PFDs using Autocad and Microstation, design review to comply with API 14C, knowledge of code and standard, process capacity check, line list and equipment list preparation, data sheet preparation, air receiver and nitrogen receiver sizing, HAZOP, report writing, site visit, carried out facility as-built and tutoring of graduate engineers etc.
Major Projects:
• Gas Transmission Pipeline and Metering Station (NIPP LOT 2, LOT 3, and LOT 4)
Client: Power Holding Company of Nigeria (PHCN) - Nov. 2006 – Sept. 2007
• Eastern Area Gas Utilization and Produced Water Disposal Project (Conceptual Design and FEED)
Client: Chevron Nigeria Limited/Delta Afrik Engineering Limited -May 2006 – Nov. 2006.
• USAN Deepwater Development Project (FPSO, Basic Engineering)
Clients: Elf Petroleum Nigeria /Doris Engineering/Delta Afrik -Dec. 12, 2005 – May 5, 2006
• ASASA Uplift Pipeline Project (Offshore Topside Facility)
Client: Mobil Producing Nigeria Unlimited (MPN)/ Willbros Group - Oct. – Dec.2005
Delta-Afrik Engineering Limited (A Deltatek and Worley Parson Company), Lagos Nigeria
Pos...
Login or Register to view the full resume.