SUMMARY OF • 6 years of professional engineering experience site design, land development and construction management
QUALIFICATION • 2 years experience in marketing, business development and project management
• Proficient in AutoCAD, AutoCAD 3D, Microstation, and Geopak
EDUCATION Master of Science in Civil Engineering 2010- 2011
University of Arkansas, Fayetteville, AR
GPA 3.15/4.0, December 2011
Bachelor of Science in Civil Engineering 2004-2006
Georgia Institute of Technology, Atlanta, GA
GPA 3.40/4.0 (Dean’s List) (High Honors), August 2006
U.S. Project Engineer 2012 – Present
ENGINEERING Civil Design Consultants, Choctaw, OK
EXPERIENCE • Prepared plans and reports
• Coordinated with City and other team members such as consultants and onsite construction superintendent
• Prepared contract documents for bidding
• Performed drainage design, site grading, roadway design utilizing Microstation and Geopak
• Prepared ODOT submittal for "Letter of Interest" for State DOT projects
• Performed construction inspection for water, sewer and storm sewer installation
Civil Analyst (Land Development Group, Wal-Mart Team) 2006 – 2008
Kimley-Horn and Associates, Fort Lauderdale, FL
Management Tasks:
• Assisted project manager for projects worth $100,000 to $20 million
• Performed value engineering by coordinating with client’s design managers, general contractor, site superintendents, construction managers and sub-contractors to deal with project issues and to achieve project milestones
• Supervised and provided guidance to team of 2 CAD drafters and 2 junior engineers
• Prepared contracts and proposals for various clients
Design Tasks:
• Used software’s such as ICPR, Cascade to perform storm water modeling and prepared drainage report for site area ranging from 1 acre to 50 acres
• Performed design coordination with Architects, MEP and Design Manager on various Wal-Mart Projects and other projects like Seagate (mixed use commercial) and Harborage Marina
• Designed and prepared conceptual, complete plan set, and construction plans using AutoCAD
• Prepared cost estimates, schedules and work breakdown structures for various projects
Construction Tasks:
• Performed construction inspections for various site/civil construction to meet design and local municipal specifications
• Prepared construction logs and reports to keep track of construction activities
Junior Engineer (Civil Division) 2005 – 2006
Rosser International, Atlanta, GA
• Prepared general specifications for roadway projects such as Herring Road – Edgeworth Road
• Assisted roadway design for Mary Freeman and J. Smith Rd (Coweta County)
• Designed conceptual and construction layout for grading, storm water, erosion, utility & site plan
• Designed retaining wall for Coweta County Courthouse and prisons for State of Georgia and Bayamon Puerto Rico
Engineering Intern 2004 – 2004
Piedmont Geotechnical Consultants, Inc., Stockbridge, GA
• Performed various laboratory and site construction material testing such as density, standard and modified proctor, CPT, SPT and unconfined compressive strength
• Performed asphalt coring and asphalt placement monitoring at Plant Yates (GA Power) and Fort Gillem
• Performed concrete test of slump, air content, unit weight at UGA...