Chintan

3/13/2014
Dallas, TX

Position Desired

Construction Engineering
Dallas, TX
Yes

Resume

CHINTAN S. PATEL

DEPARTMENT OF DEFENSE ACTIVE TOP SECRET U.S. GOVERNMENT CLEARANCE

PROFESSIONAL
EXPERIENCE

2011 – Present RAMIREZ INDUSTRIAL INC.

Home Office SAN ANTONIO, TX
Estimating Manager/Senior Project Engineer
• Managed on numerous heavy vertical & horizontal estimates for several multi-million dollar LEED projects for the DoD, DoE and DHS agencies. Lead estimator on projects with an estimating team using OST.
• Prepare estimate teams for extensive reviews with Job Sponsors, & COO to achieve best cost practices with estimates.
• Develop & prepare financial and technical evaluations for Indirect & Direct forecasting with risk analysis.
• Lead a team of creating Control Budget for a Project after Notice of Award for project startup.
• Assist PM in procurement management throughout life of project after estimate turnover.

2010 – 2011 THE CONTI GROUP

Conti Federal Services, Inc. – USACE Hurricane Protection Systems NEW ORLEANS, LA
Project Engineer III
• Construction of two reinforced concrete gate monoliths and T-walls which includes the fabrication and installation of steel swing floodgates and associated mechanical and electrical equipment; traffic control and coordination; driving steel H-piles and steel sheet piles at an est. $10 mil. Contract value.
• Assisted in procurement major commodities required and coordination with LADOTD along with various other agencies and the local community. Wrote and tracked daily quality reports for the USACE.
• Analyzed Risk & Potential in relation to Cost vs. Budget with financial forecasting for the next fiscal billing period(s) in cohesion with the cost loaded CPM schedule.

2007 – 2010 PETER KIEWIT SONS’

2009 – 2010 Mass Electric Construction Co. – WMATA RedLine Rehabilitation WASHINGTON, D.C.
Mechanical & Systems Project Engineer
• A $225 mil. valued project for the Washington Area Metropolitan Transit Authority that involves Design Build / Bid Build / Job Order Contract aspects of construction for the Red Line Metro System in 4 phases over 4.5 years.
• Created Plan the Plan job startup matrix. Assisted in creating the Control Budget for Cost vs. Budget plan.
• Work with Design firm Jacobs for systems integration plan with Automatic Train Control & HVAC systems.
• Created document control system (Project Centric) for 7 subcontractors and the Owner to manage workflow processes in handling RFI’s, Submittals, Progress Payments, Change Orders and general documents.
• Work with 4 out of 7 subcontractors in design phase to ensure job maintains on schedule.

2009 – 2009 Kiewit Constructors’ Inc. – Willis Avenue Swing Bridge Replacement NEW YORK, NY
Structural Field Superintendent / Engineer
• Replacement of existing swing bridge with a new construction valued at approx. $700 mil. in Manhattan, NY
• Led team of field supervision in constructing relieving platforms in the Bronx Yards valued at $36 mil at a high quality level with a safety factor in mind in accordance to NYCDOT & NYDOT regulations using Work Plans.
• Earned roughly $1 mil in costs with implementation of Cost vs. Attack plan on STS procurement and daily tracking of quantities and labor costs.
• Created and maintained a Daily, 3-wk and 90 day schedules to ensure activities maintained cohesion with respect to other operations and equipment.

2008 - 2009 Kiewit New Mexico – Department of Homeland Security [K3] Border Fence EL PASO, TX
Civil Field/Office Engineer
• Total contract worth of $170 mil. With the K3 section worth at an est. $35 mil. Project includes 9 miles worth of trench exc., concrete placement, steel post erection, fabrication/welding and setting of mesh panels to complete the border fence.
• Daily office tasks included ensuring proper work plans, LDR monitoring for accuracy of cost reports to managers.
• Managed crews with 3 other engineers of tot...

Login or Register to view the full resume.