SUMMARY OF QUALIFICATIONS
Experienced manufacturing with a heavy concentration in lean operations with the utilization of such building blocks as 5S and Kanban/Pull Systems. Adept at making many improvements and formulating a plan of action to meet the desired results within the manufacturing plants in which I have worked. My experience has also extended to resolving issues by using Six Sigma, Pareto/Trend Charts, 5-Why Analysis, PDCA, Fishbone Diagram, FMEA and teams. Proficient in:
• Project Management
• Microsoft Office Suite
• Total Quality Control
• CMMS (EMPAC)
• Theory of Constraints
• Total Productive Maintenance
Accomplishments
• Participated in an automotive workshop utilizing Kaizen and Six Sigma methodologies, resulting in 30 minutes being reduced on die sets
• Participated on a maintenance team that achieved a plant bottle count and start-up record
• Completed ‘Medilog Sleep Research Recorder Project’ 6 weeks ahead of schedule
PROFESSIONAL EXPERIENCE
Jabil, Memphis, Tennessee 09/11 – Present
Manufacturing Quality Trainer
• Conduct classroom quality training as scheduled for new and existing employees
• Develop new training processes and/or materials as needed
• Utilize Lean Six Sigma tools in order to resolve issues
• Perform internal/interactive and Hi-Pot testing on DirecTV units
• Conduct Process Audits in assigned areas
• Create PowerPoint training modules for assigned areas
Memphis City Schools, Memphis, TN 12/09 – 11/11
Substitute Teacher
• Provide a stimulating environment in which students can develop their full potential
• Employ a variety of teaching methods designed to capture students’ interest
• Record, assess, and communicate student progress
• Interact with teachers, parents and students
Harlem School District, Machesney Park, IL 12/08 – 12/09
Substitute Teacher
• Introduced a broad range of subjects and developed students’ literacy and numerical skills
• Employed a variety of teaching methods designed to capture students’ interest
• Recorded, assessed, and communicated student progress
• Interacted with parents, teachers, and students
BLF Electric, Redding, CA 07/07 – 12/08
Project Manager
• Served as consultant to the company as well as performed compliant analysis on low voltage lighting to Title 24 California Building Energy Code
• Completed all Title 24 lighting documentation
• Prepared material and job schedules
• Performed post job wrap up – feedback from clients
Kroger, Cincinnati, OH and Bowling Green, KY 06/04 – 06/07
Maintenance Supervisor
• Supervised 6 maintenance personnel in day-to-day activities
• Collected and interpreted quantitative data in order to reduce plant downtime
• Managed preventive maintenance in order to minimize downtime issues
• Generated work orders/parts requisitions and ensured that the work order process was adhered to
• Utilized Root Cause Analysis and teams to resolve downtime issues
• Maintained Maintenance Key Performance Indicators generated on the shop floor
Maintenance Engineer Trainee
• Provided customer feedback at weekly uptime meetings
• Interacted with production management in order to reduce plant downtime
• Initiated improvements, modifications, and repairs within the plant
• Generated work orders and parts requisitions using EMPAC Software
• Completed assigned small capital projects
• Conducted plant safety inspections as well as facilitated safety team meetings
Production Supervisor
• Supervised 19 production employees on the Iced Layer Line
• Coordinated all production activities in order to produce ...
Login or Register to view the full resume.