A dynamic, inquisitive, team spirited and performance driven environmental engineer with a diverse background in water resources, stormwater management and wastewater systems, hazardous waste management, environmental assessments, remediation and emergency response. Proficient in GIS and CAD with strong field experience in construction services for water and stormwater utilities, soil and groundwater sampling, environmental assessments, and inspection services. Seeking a challenging position in the environmental engineering field.
Education
Wentworth Institute of Technology, Boston, Massachusetts
BS in Environmental Engineering
May, 2005
Minuteman Vocational Regional High School, Lexington, Massachusetts
Majored in Environmental Technology
June, 2000
Professional Experience
Fay, Spofford & Thorndike, Burlington, MA
Assistant Engineer II
June 2005 – September 2011
Responsibilities:
Water Resources, Stormwater management, and Wastewater Systems
Design, Plan and Specification Preparation
GIS Mapping and Evaluation
Prepared Construction Cost Estimates and Quantity Take-offs
Shop Drawing Review
Permitting
Construction Services and inspection
Identification of Potable Groundwater Sources
Oversight of Drilling Operations
Pump Tests
WaterCAD, HydroCAD
Soil Evaluation for Stormwater BMP’s
Hazardous Waste Management, Environmental Assessments, Remediation Systems, Emergency Response
Oversight of Drilling Operations on Hazardous Waste Sites
Soil and Groundwater Sampling
Environmental Assessments, Risk Assessment
Oversight of Soil and Hazardous Materials during Construction
UST Removal
GIS
Health and Safety Plans
Report Writing
Williamson Environmental LLC, Leominster, MA
Summer 2004
Responsibilities:
UST Removal
Soil and Groundwater Sampling
Surveying
Drilling Oversight
Operation and Maintenance of Remediation Systems including Soil Vapor Extraction with Air Sparge, Pump and Treat, etc.
Weston & Sampson Engineers, Peabody, MA
Summer 2003
Responsibilities:
Surveying for Pre-Construction of Sewer Utilities
Assisting Engineers with Fieldwork
Office Work
Resource Options, Inc., Needham, MA
Summer 2002
Responsibilities:
Assigned to work at Triumvirate Environmental with lab pack jobs and other hazardous waste cleanups.
U.S. Geological Survey, Northborough, MA
1998-2001, Summer’s and 2 days a week (co-op)
Responsibilities:
Working with the Water Resources Group, projects included studies on reservoirs, streams, rivers and lakes around New England. Duties included various field work, data entry, GIS, report writing, power point.
Achievements
• Co-Author of USGS Fact Sheet, “Storms, Streams and Reservoirs – Assessing Water Quality in the Cambridge, MA Drinking-Water Source Area”
• National Honor Society/Deans List
• 3rd Place Award MIT Science Fair Project
Specialized Training
• OSHA Confined Space Entry Training
• OSHA 40 Hr. Hour Hazwoper Site Worker
• OSHA Construction Industry Training
• Design and Construction of Wells, NGWA, 2007
• Field Skills: GPS equipment, Total Station, Water Quality Analysis Equipment
• AutoCAD, GIS, Modflow, Microsoft Visio, WaterCAD, HydroCAD
• Breeze Air Pollution/Dispersion Modeling
• Microsoft Word, Excel, Power Point, Outlook, Access, Frontpage
• Strong Report Writing, Problem Solving and Communication Skills
Representative Project’s
Water Resources, Stormwater management, and Wastewater Systems
Water System Improvements, Fall River, MA. Assisted in multiple projects including water main replacement, water services replacement, pump station upgrade, and storage tank replacement. Assisted with estimates, report writing, and CAD and GIS drawings.
Removal of Lead Water Services, City of Fall River, MA. For the City of Fall River, work involved removal of lead water services throughout the City. Job role included full time inspector over construction activities for the duration of the project. Included daily reports documenting all activities, pictures, ties, quantities of all materials used, samples and a report.
MWRA Northern Intermediate High Assessment and Concept Plan. Identified various pipeline routes and short term improvements to address the lack of redundancy in the system. Collected field information including pipe lengths, existing utilities, and ease of construction for feasible pipeline routes. Identified existing and potential interconnections for short term improvements. Assisted with estimate for various pipeline alternatives. Provided GIS mapping and CAD drawings.
MWRA Water Transmission Redundancy Plan. This study evaluated the MWRA’s metropolitan transmission system to determine what capital improvements are required to allow critical infrastructure to be removed from service for maintenance while still maintaining adequate pressures throughout the service areas. Assisted with conceptual drawings in CAD, route analysis, GIS, and economic analysis.
Northern Intermediate High Watermain Design. Assisted in the design of approximately 7 miles of 30”+ watermain. Design included CAD drawings and GIS maps, route analysis, and economic analysis.
Engineering Services, City of Peabody, MA. Assisted in determining the capacity of storage in three reservoirs using historical flow and reservoir level data to develop a mass balance of the system. Assisted in developing the mass balance model in Excel and developing stage-storage curves for each reservoir.
New Groundwater Supply, Town of Sterling, MA. The work involved the activation of a new 3-well wellfield with a total yield of 500 gpm. Assisted in planning, permitting, drilling oversight, pump test, data analysis, groundwater sampling, surveying, report writing, and CAD and GIS drawings.
New Groundwater Supply, Barnstable Fire District, Barnstable, MA. Provided field inspection during the construction of a new pumping station.
John J. Carroll Water Treatment Plant – As needed services contract. Provided CADD support for various as needed improvements for the John J. Carroll Water Treatment plant.
MassDOT Stormwater BMP Design - Cambridge, Middleborough, Leominster. Provided NCRS soil evaluation for the design of a stormwater BMP.
Sewer System Evaluation Survey, Belmont, MA. Responsible for a team of field investigators evaluating the structural integrity and potential inflow/infiltration sources of 1500 manholes town...