EDUCATION:
1996 – 2000: University of Alabama, Huntsville Huntsville, Alabama
Bachelor of Science in Electrical Engineering
SUMMARY OF QUALIFICATIONS:
Subsea Control Engineering, responsibilities include development of subsea system overview schematics (hydraulic/chemical & electrical), scope of supply drawing, specifications and Request for Quotes (RFQs). Worked with vendors and clients to manage interfaces, addressing interface issues during all phases of engineering, manufacturing, inspection and testing. This included the review/comment Factory Acceptance Test (FAT) and Systems Integration Test (SIT) plans as a project team member. Attended FAT to ensure the test is performed according to the approved procedure. Attended SIT as a control team member and in charge of the loose item inventory. At MetroPCS designed, optimized, implemented, and managed of telecommunication cell sites and fixed network databases. While at Science Applications International Corporation (SAIC) performed Systems Engineering functions to include requirement analysis and Validation and Verification (V&V) documentation development.
PROFESSIONAL EXPERIENCE
Oct. 2008 – Present: Pegasus International Inc. Houston, Texas
Project Engineer II
• High level consultant engineering support for projects (listed below) in various lifecycle phases, including:
- Noble Aseng Project (from conceptual through FEED, detailed design phases and load out)
- Ceiba Flowline Gas Lift Retrofit Project - Longhorn Phase III Project
- Triton MC728-02 Project - Tahiti and Blind Faith Project
- Devils Tower Southwest Project - Ekanga Project
• Developed, reviewed and revised various functional design specifications for Subsea Control System
• Developed, reviewed, and revised in following areas: hydraulic / chemical and electrical schematics; scope of supply drawings; reviewed 2-inch gas lift/service line option study report consisting of cost comparison, material selection and system requirements.
• Reviewed subsea control equipment manufacturer’s general assembly drawings.
• Developed control feasibility study, concept comparison report, and cost evaluation report on the Ceiba Flowline Gas Lift Retrofit Project.
• Working knowledge various standard including API and ISO standards.
Mar. 2004 – Oct. 2008: MetroPCS Norcross, Georgia
RF Engineer
• A team member of 1st Network Integration Launch Project (Jacksonville, Florida)
o Performed On the Air (OTA) Activation of 90 cell sites prior to network launch date exceeding corporate goals by 20%
• Designed and implemented first 2 new Six Sector area cell Sites in the Atlanta Market proving the most effective use of the equipments/resources & resulted adding more six sector sites.
• Performed full site integration & system optimization analysis on identified new sites.
• Reviewed construction drawings to validate the new site locations, antenna centerlines, antenna orientation and types.
• Coordinated with construction teams to implement corrective actions to improve coverage and service performance of troubled sites
• Improved designs for better performance through antenna analysis/orientation and software/hardware equipment modifications
• Developed new RF measurement tools to export a data (ex. failure info) from a master database using a key word.
• Fixed Network Database Management
o Provided field operation support to ensure on-time delivery of circuits at the cell site and to resolve any circuit-prov...
Login or Register to view the full resume.