OBJECTIVE
Accomplished Project Engineer/ QC-QA Manager/Lab Manager with experience in civil engineering, construction management, material coordination, project scheduling, proposal & RFI preparation, construction inspection & construction materials laboratory and field testing, seeks engineering position with long term growth potential in construction industry.
SUMMARY
Dynamic multi project management & problem solving skills and with excellent communication skills. Experienced with construction field inspection, perform design calculations, cost estimation, preparation of RFIs, scheduling and project management, laboratory testing, and analysis of soils and materials and field quality assurance and quality control on QC/QA. Areas of expertise include using government and private reporting system such as IDOT, ICORs, I-Mirs, Proliance, CDOT, MDOT Field Manager, etc. Very willing to learn and diversify expertise.
PROFESSIONAL EXPERIENCE
2001 - 2011 Great Lakes Soil & Environmental Consultants, Inc. Bolingbrook, IL-Novi, MI
Project Engineer/Assistant Project Manager/Materials Coordinator
• Project Engineer in civil engineering with management and technical duties. Developed new company location in Michigan Area. Responsibilities included getting lab approval, marketing efforts, and meeting prospective customer & proposals preparation.
• Project coordination for the out of state projects including project management, client coordination, proposal & RFD’s preparation, scheduling, site visits, reports reviewing for various IDOT & Tollway projects.
• Material Coordination for IDOT & Tollway Projects. Responsibilities include material coordination, construction inspection measurement, computation and preparation of IDR’s, maintain material delivery logs, documentation of daily field activities, field inspection for roadway and bridge including PCC pavement, Latex Overlay construction. Reviewing QA/QC reports and reports to IDOT/Tollway materials.
• Quality Assurance manager for precast products for various tollway contracts.
Tollway Systemwide Engineer – (Dec/2007–Nov/2008)
I294/94 from Ballard Road to Grand Avenue-Various ISHTA contracts- Eight Different Contracts- 30Mile long reconstruction)
• Represented Illinois Tollway as Systemwide Engineer, Duties included scheduling coordination with different contractors, providing recommendation, attending progress meetings for all the contracts, monitoring Quality Control procedures, reporting to Tollway Authority on daily basis and assuring overall quality of soils & aggregate materials as per ISTHA specification. Monitoring work-included embankment, subgrade testing, proofrolling, PGE placement, PGE crushing, backfill soil compaction, soil bearing pressure check & other soils work on all eight different contracts. Performing Reviewing of the soils & aggregate reports. Reporting Inspection Daily Reports (IDRs) through tollway reporting system PROLIANCE.
Field Engineer /Material Coordinator/QCQA Manager/Lab Manager – (May 2001-Dec/2007)
List of some of the projects:
Great Lakes Naval Base, Great Lakes, IL
ADA Ramp Program (City of Chicago)
27th Street – Pedestrian Bridge (Metra)
47th Street- Reconstruction-Gresham Station (Metra)
Elgin Toll Plaza, I-05-5301 (ISTHA)
I-355 Open Road Tolling Various Plazas , I-05-5315 (ISTHA)
I-88 Toll from Rt 59 to Naperville Rd, RR-04-5198 (ISTHA)
I-355 Shoulder Replacement ISHTA # RR-02-5127
I-294 (Advance Work MP 11.1 (north of Cal-Sag Channel) to M.P. 17.6 (95th Street) (7/2003-11/2003):
Quality Assurance –IDOT-District One –Various Counties, Various Locations (2003-2004)
US RT 6, 62490 (IDOT)
RT 58-/72, 60739 (IDOT)
Duties:
Login or Register to view the full resume.