Arjun (Engineer in Training)
OBJECTIVE
Seeking a full time position in the field of civil Engineering
EDUCATION
Master of Science, Civil Engineering (Fall-11)
Texas A and M University GPA 3.6/4.0
Bachelor of Engineering, Civil Engineering (summer’08)
Osmania University, Hyderabad GPA 3.6/4.0
CERTIFICATION
Passed Fundamental of Engineering–Texas Board (April 2011)
OSHA 8 hr. Hazpower refresher
Computer Skills:
AutoCAD-3D, HEC-RAS, Hydro cad, C,C++., Excellent knowledge in VISSIM, HCS +, synchro, Micro Station NEMA traffic controller, Theodolites, RSAP, Arc GIS, GPS Mapping, RTMS (G4), MS Word, MS Excel
RELATIVE COURSES:
Advanced structural engineering, Prestressed concrete, Advance reinforced concrete design, Hydraulics of open channels, Fundamentals of water quality engineering, Ecological engineering, Fundamentals of air quality& pollution controls, Transportation engineering design, Geographic information systems
WORK EXPERIENCE:
CIVIL ENGINEER (April 2008-August 2009)
ARVEE Associates, Hyderabad
• Supervised roadway construction during site layout, material procurement & testing, on-site QA/QC.
• Performed traffic studies (Volume, Intersection, and Axle Load) on National Highway 7.
• Assisted in the preparation of roadway design plans including design of horizontal & vertical curves, and drainage.
• Prepared and interpreted regulatory property rules/policies, specifications, construction plans, cost estimations, cost analysis, permission plans and also modified drawings in Auto CAD with detailed dimensions.
• Assisted in preparation of cost estimates using different management analysis software application.
• Organized and prioritized work assignments for junior engineers, a large work force and coordinated with them on field data collection related to speed limits, traffic safety, traffic accident and pedestrian accident study projects.
• Coordinated with consultants, real estate agencies on highway construction/maintenance projects.
• Worked on highway development/construction/maintenance projects, acquiring property rights implementing government standards/procedures including environmental clearances from the public private agencies.
• Identified & resolved engineering problems when interacting with team members, contractors/agency members and recommended solutions through office & field investigations.
• Provided relocation assistance to the property owners/agencies adhering to government rules, policies & guidelines.
• Collaborated with maintenance personnel on highway maintenance activities, maintenance data gathering, data reduction, data analysis/evaluation and prepared graphic representations and comprehensive comparative reports.
ACADEMIC PROJECTS:
Design of water treatment process:
• Designed the Water treatment process for the future having present Population of 10,000 in a city and general usage of water per capita volume of 1.25MGD.
• In this project by collective group work we proposed two solutions based on cost and efficiency which include are by extending existing plant for future or construct new treatment plant based on efficiency. Considering the future population for next 10-15 years the recommendations are provided.
Design of wetland:
• Design of wetland near Flint hills (Corpus Christi) for area of around 24 acres of land for rainwater and flint hills wastage water.
• ArcGIS software is used to surveying the land for calculating the area.
• Annual rainfall, precipitation, types of vegetation, evapo transportation are considered for the amount of water retained in the area.
Efficiency for removal of gaseous contaminants:
• Removal of gaseous contamina...
Login or Register to view the full resume.