OBJECTIVE: To secure a RCRA / CERCLA / TSCA related Environmental Engineering / Hazardous Waste Management position in a reputable company on a contract or permanent basis
EDUCATION: Master’s Degree in Civil Engineering from Brigham Young University, Provo, Utah
LICENSE: Registered Professional Engineer (P.E.) in the State of Delaware
CLEARANCE: Held U.S. DOE’s Top Secret Security Clearance (Q - Clearance)
EXPERIENCE:
BECHTEL POWER CORPORATION
Watts Bar Power Plant Feb. 2008 – Oct. 2010
Browns Ferry Nuclear Power Plant Nov. 2002 – Oct. 2003
Pipe Support Engineer
• Prepared Pipe stress data for entry into ITEL program
• Prepared Pipe support data for entry into ITEL program
• Verified others’ data for accuracy
• Worked on other system design data entry
ENVIRONMENTAL COMPLIANCE Dec.1999 – Nov. 2002
TECHNOLOGY Oct. 2003 – Feb. 2008
Independent Contractor
Knoxville, Tennessee
Environmental Manager
• Prepared Waste Management Plan
• Prepared Demolition Project Plan
• Reviewed data files and provided expert guidance for compliance
• Performed engineering data entry work for power plant
WESTINGHOUSE / ONSITE ENGINEERING Sept. 1999 – Dec. 1999
West Valley, New York
Environmental Engineer
• RCRA Compliance work for West Valley Nuclear Services Demonstration Project
• Files auditing
• RCRA Regulatory Counseling
• Data entry
Brahmbhatt-2
DOE / BECHTEL-JACOBS / August 1997 – Dec. 1998
INTERNATIONAL ENGINEERING
Portsmouth, Ohio
Project Manager
• Developed and executed Waste Characterization Plans
• Supervised the visual inspections and sampling of the waste containers
• Reviewed and interpreted the waste Characterization Plan results
• Assessed the characterization data and determined the classification of the waste
• Reviewed RCRA regulations throughout the waste characterization process
• Received concurrence on the final classification of the waste from the Environmental Compliance Department
DOE / LOCKHEED MARTIN ENERGY SYSTEM Dec. 1991 – March 1996
Oak Ridge, Tennessee
Environmental Engineer
• Provided technical expertise to the Environmental Restoration ( ER ) and Waste Management ( WM ) Divisions for compliance with the Federal and State regulations as well as DOE Orders
• Modified Part A and Part B permit applications and received RCRA Part B Permits at the K-25 site for RCRA Treatment, Storage, and Disposal ( TSD ) Units namely, Container Storage, Tank Storage and Treatment, Waste Piles, and the Toxic Substances Control Act ( TSCA ) Incinerator
• Prepared permit modifications for regulatory compliance and various conditions
• Authored Energy System-wide Procedures for RCRA Permits
• Modified Closure Plans and corrected deficiencies for closing the units in accordance with the RCRA regulations for approval by the State
• Inspected TSD Units, PCB Units, Treatability Study Reports and provided regulatory guidance to protect the DOE from the potential Notice of Violation ( NOV ) from the State or the EPA
• Fielded questions from different Divisions while interacting with RCRA, TSCA, National Environmental Policy Act ( NEPA ), and Comprehensive Environmental Response, Compensation and Liability Act ( CERCLA ) regulations
• Interpreted permit conditions and related regulations to monitor compliance
• Identified needs for permit modifications for compliance
Brahmbhatt-3
STATE OF DELAWARE June 1976 – August 1991
DEPARTMENT OF NATURAL RESOURCES
Dover, Delaware
Environmental Engineer
• Reviewed RCRA Part A and Part B permit applications
• Wrote RCRA Part B permits
• Inspected RCRA facilities and prepared reports
• Monitored compliance with permits, Administrative Orders, and RCRA regulations
• Reviewed proposed and final regulations on Container Storage, Tank Storage, Surface Impoundments, Land Treatment, Landfill, and Incineration Units
• Reviewed technical reports and made recommendations for Environmental Compliance based on technical knowledge of Engineering principles, Environmental Sciences, Geohydrology, soil Science, and regulations
• Took enforcement actions and issued NODs, NOVs, and Administrative Orders
• Reviewed Closure Plans including financial assurance documents and construction quality assurance plans
• Reviewed Post-closure permit application for writing permit
• Represented the State in Public Hearings
• Acted as a liaison / coordinator between RCRA, CERCLA, Underground Storage Tanks (UST), Emergency Response Groups, Federal and State governments, major industries, consulting firms, Citizen Groups, and environmentalists
• Developed pre-treatment program, construction permits, and wrote municipal and industrial National Pollutant Discharge Elimination Syste...
Login or Register to view the full resume.