WORK SUMMARY
• Industrial Engineering / Process Engineering / Technical Specialist /Logistics
• I have an excess of twenty-five years of vast experience working in various industries and aerospace organizations.
• Advocate of new technologies, equipment, methods and processes empowering organizations for diversification, modernization and change.
• I have a sound background in integrating new technologies, purchasing new equipment and administering contracts, leading, training and managing personnel.
• Business oriented, articulate and qualified to make factually sound decisions.
• Security Clearance: Secret (Current)
ENGINEER ENGINE AIRCRAFT PARTS/ENGINEER II
Dynamics Research Corporation October 2010 –June 2012
Perform technical assessments; determine an Item Unique Identification (IUID) marking location on aircraft parts.
Analyze material properties, IUID marking type, fixture design, draft technical data/drawings, and consult with government reps or original equipment manufacturers of aircraft accessory and component parts.
TECHNICAL SPECIALIST, LEAD ENGINEER
ICF International, Warner Robins, GA October 2009 – January 2010
• Provided guidance to the Level 1 Engineers for the development of technical data packages needed to implement the Item Unique Identification (IUID) hardware marking process in the Dothan, Alabama for the TH-1H Helicopter.
• Facilitated with relevant guidelines and standards in the research and preparation of engineering drawings.
GENERAL ENGINEER II/INDUSTRIAL ENGINEER
SAIC International, Warner Robins, GA February 2007 – October 2009
• Carried out static, dynamic design and analysis of mechanical systems, equipment packages.
• Conducting feasibility studies and testing on new and modified designs. Directed support personnel in preparation of design and testing detail and prototype fabrication.
•Assisted with drafting and packaging documentation design
• IUID Engineering Orders and documentation
ENGINEER 2
Automated Sciences Group, Warner Robins, GA July 2002 – February 2006
• Performed industrial process improvement studies at Robins AFB for C-5 and C-130 maintenance overhauls.
• Conducted time studies on shop floor processes (stopwatch and random sample).
• Performed assignments requiring the development of new or improved techniques and procedures.
• Developed new or refined equipment, materials, procedures, products, and/or scientific methods.
• Analyzed process descriptions and recommended process and technology improvements to government points of contacts via technical reports and/or presentations.
ENGINEER 3
Automated Sciences Group, Oklahoma City, OK September 2000 – June 2002
• Performed industrial process improvement studies at Tinker AFB for KC-135 and E-3 (AWACS) aircrafts.
• Analyze process descriptions and recommend process and technology improvements to government points of contacts.
• Supervised approximately 4-8 industrial engineers and technicians.
• Acted as liaison with government clients in the respective product directorates on technical issues and process study scheduling with production personnel.
• Compiled and proofed contract deliverables according to USAF regulation covering engineered labor standards.
• Responsible for final engineered labor standards report development to schedule.
• Performed time studies on shop floor processes (stopwatch and video).
INDUSTRIAL ENGINEER
Hart Schaffner & Marx, Des Plaines, IL March 1999 – September 2000
• Responsible for processes, methods, work measurement, labor standards and shop and warehouse floor plan layouts for machines, and workplace in the states of Illinois, Indiana and Michigan.
INDUSTRIAL ENGINEER
Milsco Manufacturing Co., Milwaukee, WI August 1997 – November 1998
• Responsible for processes, methods, work measurement and labor standards; plant, machine and workplace layouts in both factories.
• Provide first run labor standards in a fas...
Login or Register to view the full resume.