Tim

9/13/2014
Fountain Valley, CA

Position Desired

Manufacturing Engineering
Anywhere in the U.S.
Yes

Resume

OBJECTIVE:

Manufacturing/Design Engineer, interests in lean mfg. Methodology and product development and design


EMPLOYMENT HISTORY:

Jun 2007- Manufacturing Engineer, Kyocera Tycom Corporation
Current Costa Mesa, California
„h Provided mfg. Eng. Support by supporting in-process product data collection systems throughout the shop floor and assembly departments. Also provide product design and specifications for the production using PRO-E, AutoCAD, Solidworks and MS Access. Consolidating specifications and dwgs into PRO-E from other software packages.
„h Coordinated and participated in lean mfg. projects for facility layout for improved process flow throughout shop floor and quality improvements through product defects reduction.
„h Improvement projects include mfg. data and specifications automation for product cycle time improvements, and DFM projects for low cost solutions and improved quality, Automating specifications and SPC data generation for process controls.
„h Team participation in many lean mfg. initiatives and projects including ISO and EMS involvement.
„h Created and managed documentation systems for standard work procedures

Mar 1997- Production Control Manager, Tycom Corporation
Jun 2007 Irvine, California
„h Supervised Production Control department and production control systems
„h Improvement projects include Production scheduling for improved product cycle times and line balancing efforts and value stream mapping for production and delivery improvements in multiple facilites worldwide
„h Monitored global multi-facility production and delivery schedules
„h Created/maintained companies mfg. and delivery metrics and reports (cycle time and OTD)
„h Created Operation and Routing information in company¡¦s MRP system for proper shop routing
„h Evaluation of Production Scheduling software for optimized shop floor order control

July 1991- Design Engineer; Pollution Control Engineering, Inc.
Mar 1997 Irvine, California
„X Designed wastewater treatment systems/equipment from concept to startup
„X Created CAD drawings for companies projects
„X Created customized CAD programs for department standardization and use
„X Maintained companies computer and networking systems
„X Created and maintained document control system

April 1988- Documentation Manager; University of Utah Artificial Heart Lab,
June 1990 Salt Lake City, Utah
„X Created document control system for all department¡¦s documents
„X Gave final approval on all documentation for departments use
„X Managed all ECO and documents approvals according to ANSI 14.5 and 14.6
„X Assisted in R&D projects performed in the department

May 1984- Systems Designer/ Drafter; Water and Power Technologies
Feb. 1988 Salt Lake City, Utah
„X Designed water treatment sys...

Login or Register to view the full resume.