Electronic Power Design (EPD), Houston, Texas Dec 2011—Current
Manufacturing Engineer
—Assisted with the operations management of the Houston facility, which designs and manufactures power control equipments. My job is to get heavily involved in the daily work of each department, looking into the process flow in the life cycle of a whole project, starting from sales communicating with prospect customers to get firmed orders, until we engineer, source parts, manufacture, and finally ship out the products. Discover problems; perform root cause analysis; streamline the corporate operations.
—ISO 9001:2008 Implementation and Certification (Certified Lead Auditor); Quality Engineer Role

Electronic Power Design (EPD), May 2010—Aug 2011
Systems Engineer (Work Locations: Houston, China, France)
—Assisted operations manager with the set-up and management of a new manufacturing facility, which builds an innovative version of trailers for customs port use.
• Plant Layout Design and Machine Selection: Participated in the design, layout, and project oversight of a manufacturing facility set up & management; selection of machining equipment (plasma cutting machines, bending machines, welding machines, etc.); established material handling principles, performed evacuation and egress studies.
• Production/Sourcing Planner: Assisted in the coordination and management of production & and its supporting departments (Purchasing & Logistics, Engineering, Inventory, and QC); Analyzed MRP (Vantage, Epicor Software) to schedule all parts under control, track production progress and inventory level, maintain the ERP system; 5S and Kanban system application for the manufacturing facility; led the mapping of work process for each operations department.
• Paint System Design: Together with the equipment contractor, performed conceptual and mechanical design of the paint line. The system applies power and free conveyor system, incorporating stations of Sand Blasting, Degreasing & Silane Treatment, E-Coating, Electric Powder Spraying, as well as Convection Ovens. Performed detailed design, sizing, lay-out of all equipment, pipes, valves, and electric control system. Supervised the installation/testing/production of the production line, studied and selected consumables for the whole system.
• Compressed Air System/Waste Water Treatment System: Studied and selected the major components for an industrial compressed air system: Compressor, Dryer, Filter, and Receivers; Designed the air distribution system; Coordinated with equipment contractor for both conceptual and mechanical design of an onsite waste water treatment system meeting the requirements of EPA.
• Project Management of Trailer Frame Fabrication Subcontract: As the team leader, supervised the Tianjin production work (the five major manufacturing processes involved are: steel plate cutting, bending, welding, painting, and assembly); coordinated the technical communication (BOM and Drawing issues) between Tianjin professionals and French team & Gaussin trailer design engineers; managed EPD employees sent to Tianjin for training.
ACADEMIC PROJECTS
Systems Integration and Optimization Group, Texas A&M University January— May 2010
• Performed conceptual design of bio refinery process to convert sorghum for biodiesel production: completed process design, process integration and optimization, as well as economic analysis.
• Performed process optimization studies for productivity enhancement and energy conservation, used systemic mathematic methodologies to identify optimum.
Celanese Plant Design Competition (First Place Member) August—December 2009
• Produced detailed conceptual design for a 300kTa vinyl acetate unit using vapor phase ethylene ...