Project Management / Construction Coordination / Maintenance Management
Construction Management
Industrial Maintenance
Machine Installation
Safety Management
OSHA
Utilities
Environmental
Budget Management
Capital Purchasing
Fabrications
Engineering Support
Mechanical
Civil / Structural
EXPERIENCE
United States Steel / Hatch Alliance ($3 Billion dollar division) ( 03/12– Present)
Project Manager Ecorse, MI
• Developed or developing business case, concept & bid packages for
Blast Furnace Top Change, Stave Replacement & ‘Shotcrete” Repairs ($30 million)
Blast Furnace B-2 # 2 Stove Repairs & Fce. Outage ($14 million) Completed
BOP Furnace Exchange ($26 million)
Blast Furnace Flare Stack ($5 million)
United States Steel / Worley Parsons Alliance ($3 Billion dollar division) ( 03/11 –3/12)
Project Manager Ecorse, MI
• Developed or developing business case, concept & bid packages for
Blast Furnace Top Change and Repairs ($36 million)
BOP Furnace Exchange ($26 million)
Blast Furnace Flare Stack ($5 million)
ThyssenKrupp Steel USA ($5.6 Billion dollar project) (09/’09 – 03/11)
Construction Project Manager & Coordination Supervisor Calvert, AL
• Key individual responsible for management, problem solving and recommendations for successful structural completions of all 4 buildings of the T-K Hot Dip Galvanizing complex and the Chem. Lab and Quality Control building.
• Able to keep construction standards on track and meet goal set by T-K management.
• Professional in the review and process of design ready and issued for construction drawings.
• Ability to foresee drawing conflicts and resolve prior to commencement of work.
• The foresight to oversee all trades properly and alleviate potential coordination issues further as the structure was under construction.
United States Steel - Great Lakes Works ($3 Billion dollar division) (06/’05 - 11/’08)
Construction Manager and Project Manager – Engineering Ecorse, MI
Responsible for multi million dollar “capital & engineered” projects from initiation through commissioning.
• Replacement of $30 million Blast Furnace Stove
• Developed business case, concept & bid package for:
Ore Dock TWIC regulations / Homeland Security ($3 million)
Blast Furnace Stove ($21 million)
Construction Manager
Environmental Improvement projects ($80 million)
Construction management of building complex: ($1.6 & $4 million)
Testing & grinding equipment for Metallurgical & Chemical Labs ($1 million)
Maintenance Solutions and Consulting L.L.C (03/’00 - 06/’05)
President / Owner Detroit, MI
• Construction Manager Multiple BOFP (Basic Oxygen Furnace Process) repairs and Reline projects $9 to $12 million average range.
• Redesigned and built BOFP scrap charging boxes.
• Removed, refurbished and replaced entire tilt drive system of BOFP vessel.
• Implemented Chock Maintenance Programs for:
• Tandem Mills, Temper Mills, Hot Mills & Continuous Galvanizer Lines.
• Management overview of Fabricators and Machine Shops for manufacturing parts & consumables for durable goods manufacturers.
National Steel - Great Lakes Steel ($300 million Division of National Steel) (08/’70 - 02/’’00)
Maintenance Supervision Detroit, MI
Responsible for the safety of employees, maintenance and maintenance planning for:
Buildings,
Conveying systems,
Equipment,
Compressed air,
Potable water,
Service water,
HVAC,
Natural gas lines,
Oxygen lines,
Valves,
Hydraulic systems,
Fluid management & Overall maintenance of facilities, equipment, related components
Continue: (National Steel - Great Lakes Steel)
• Supervised / managed over +250 employees and $20 million annual budget.
• Supervised / actively participated in ( 5 ) BOFP vessel exchanges.
• Supervised installation, upgrades or rehabilitation of bag-houses & electrostatic precipitators
• Supervised / presented technical papers to the A.I.S.E. on BOFP.
• Reduced down time and increased production levels of the National Steel Electric Arc Furnaces at the Great Lakes facility.
• Team Member Technical Problem Solving Department, Senior Mechanical Control Engineer and Team Leader Of Steelmaking Planning.
• Redesigned furnace shells to extend life and eliminate costly rebuild, costly maintenance and safety concerns.
Recent Work Achievements:
Project & Construction management of engineered capital expense projects for Fortune 500 steel manufacturing f...
Login or Register to view the full resume.