Richard

12/4/2014
Santa Clara, CA

Position Desired

Industrial Engineering
Santa Clara, CA
Yes

Resume

SUMMARY:
* Over 10 years of experience in industrial engineering and project management.
* Experienced in warehouse process improvement, systematic process improvement, time and motion study, work measurement, lean implementation, six sigma methodologies, standard work, new product introduction, manufacturing process development & improvement, waste elimination, project management, process validation, sustaining engineering and interface with various departments as a functional and cross-functional leader.
* Knowledgeable in production problem solving, FMEA, lean practice, operations process improvement, time and motion study, standard work, material handling and cost reduction techniques, work documentation and general operations support in dynamic environment and cross-functional areas
* B.S., Industrial & System Engineering and M.S., Engineering (concentration: Engineering Management).
* Can work independently on day- to-day work and general instruction on new assignments.
* Major strengths: strong skills in verbal and written communication, teamwork and organization. Proactive with creative problem-solving skills, adaptable to a diverse task-oriented environment, well organized , and motivated to preserve and achieve all goals.

EMPLOYMENT HISTORY:

RED Technology, Pleasanton, CA (2003 - Present)
Lean Project Manager
* Study operations to identify wastes and to standardize high-value tasks.
* Recommend and implement methods for improving utilization of resources and information.
* Provide support to multi-projects for prototypes of the flow, visual design and functionality.


Agilent Technologies, Santa Rosa,CA (2011 - 2012)
Industrial Engineer(Contract)
*Coordinated in phasing out existing products in term of materials and inventory.
*Provided analysis and support in disposition aging inventory items.
*Planned, organized and conduct 5S event in NPI production environment.


Oxford Instruments, Scotts Valley, CA (2010 - 2011)
Manufacturing Engineer (Contract)
*Managed and coordinated projects for purchasing, installation and qualification of new equipments for production ramp up.
*Generated and revised various manufacturing and test procedures.
*Coordinate various maintenance and safety-related work.


American Airlines, South San Francisco, CA (2009 - 2010)
Material Logistic Specialist
* Responsible for receiving, binning, issuing, and shipping material located in line station stockrooms and warehouses.

United Services., South San Francisco, CA (2004 - 2008)
Senior Business Analyst, Central Distribution Services
*Initiated and coordinated with multiple groups for lean planning and implementation including establishment of performance metrics, lean setup, roles and responsibilities, 5S, training etc.
*Provide various essential on-going operations support to improve lean process such as tracking and
analyzing lean performance and sustaining.

Lean Specialist, Engine Shop (September, 04 - December , 06)
*Coordinated with various departments for various lean production projects in the engine maintenance
shop: kit building, 2-bin Kanban, pertinent process flow, procedures and lean engine Web site.
* Provided all essential on-going support to improve lean flow line such as modifying scripts, kit and
expendable parts lists.
* Recognized as a top performer. Received "Exceeds Expectation" merit rating in 2006 performance review.


Boston Scientific., Fremot, CA
Contract Industrial Engineer (2004)
* Conducted time and motion study for subassemblies and final integration.
* Performed work analysis & line balance to offer recommendation for process & productivity improvement.

CoorsTek., Fremont, CA
Manufacturing Engineer(2002 - 2003)
* Resolved various manufacturing-related issues on the floor.
* Developed proper documentation including verifying BOM, workmanship, inspection checklists, etc.
* Determined time standards and labor resources for production.


Lam Research., Fremont, CA
Senior Manufacturing/Industrial Engineer(2000 - 2001)
* Planned and implemented lean manufacturing lines for six subassemblies and two final integrations to bring new $4 millions equipment products from prototype to production.
* Developed proper documentation including verifying BOM, generating SOE, Operations Method Sheet and Factory Audit Checklist.
* Determined time standards and labor resources for special assignment and projects.
* Provided daily operations and sustain engineering support.
* Interfaced with Design Engineering in developing designs for manufacturability ...

Login or Register to view the full resume.