OBJECTIVE: Seeking a full time, entry level engineering position.

EDUCATION:
UNIVERSITY OF CALIFORNIA LOS ANGELES
Certificate in Construction Management (June 2013)
CALIFORNIA STATE UNIVERSITY NORTHRIDGE (Northridge, CA, USA)
Bachelors of Science in Civil Engineering (December 2007)

RELEVANT EXPERIENCE:

SOTRADEMA (FES, MOROCCO)
Planning Engineer (august 2010-february 2012)
• Participated in organizing the building of the wastewater treatment plant of the city of FES.
Tasked Performed:
• Planning and scheduling.
• Cost estimation and budget control,
• RFI logs, submittals, change of orders
• Solutions implementation to improve Quality and safety on site.
• Coordination (Sub- contractors, GC, owners, engineer and Suppliers)
• Weekly progress reports

ENTERPRISE “EL OULLAF” (AGADIR MOROCCO)

Assistant Project Manager (February 2009- June 2010)
• Participated in organizing and managing, the construction of a low cost, residential housing project.
Tasks Performed:
• Project planning and Scheduling.
• Coordination (owner, GC, Architect, engineer, Suppliers)
• Cost estimation, budgeting,


PHYSICAL PLANT MANAGEMENT (PPM) NORTHRIDGE CA USA
Student Engineer (August 2006 –December 2007)
• Participated and worked closely with professional during the installation of a 1 MW Hydrogen fuel- cell power plant in California state university Northridge.
Task Performed:
• Researched fuel cell operation principles, project feasibility, and prepared the bid specifications for the Hydrogen Fuel Cell.
• Preliminary calculations for optimal performance.
• Assisted in the design and development of waste recycling system.
• Assisted in preparation of power point presentations, proposals, schedules and project reports.

ACADEMIC PROJECTS:

Survey Project, fall 2005
Participated in a design project, consisting of using surveying techniques to design a concrete driveway.
Tasks performed:
Research, Cost estimation, Data analysis-Processing and Auto-Cad drafting.

Seismic Design Project, 2007
Participated in designing and building of a scale model of a nine story building, using seismic design principles.
Tasks performed:
Assisted in research, design and development of the seismic design system...