Melissa

2/14/2015
Reading, PA

Position Desired

Electrical Engineering
Anywhere in the U.S.
Yes

Resume

SUMMARY
B.S., Electrical Engineering, Penn State University, University Park, Pennsylvania with over eight years of electrical experience with WorleyParsons. My software expertise includes ETAP PowerStation, and WinIGS Grounding Software with proficiency in various other engineering software. I have a solid technical background with extensive experience in calculations, procurement, and design of one-line diagrams, three line diagrams, and wiring diagrams. I have worked under a senior supervising engineer designing large combined cycle power plant projects from start to finish.

EXPERIENCE
2004 – Present Technical Specialist I – WorleyParsons, Reading, Pennsylvania
Combined Cycle Power Plant Experience, Power generation medium and low voltage equipment.

Lodi Energy Center, Lodi California

Assisted the lead electrical engineer in design of a combined cycle power plant from start to finish. Responsibilities included development of one-line diagrams, three-line diagrams, logic diagrams, preliminary equipment sizing calculations; Short Circuit, Load Flow, Grounding, and Arc Flash Calculations; Specifications; Datasheets; Engineering Requisitions; Relay coordination calculations; and setting GE 750 and 745 Relays.

El Vigia Power Center, Venezuela
Assisted the lead electrical engineer in design of a combined cycle power plant from start to finish. Responsibilities included development of one-line diagrams, three-line diagrams, logic diagrams, preliminary equipment sizing calculations; Short Circuit and Load Flow Calculations, Specifications; Datasheets; Engineering Requisitions; Relay coordination calculations; and setting Siemens differential, feeder, and motor relays.

Gemma – Colusa Generating Station Combined Cycle Project
Assisted the lead electrical engineer in design of a combined cycle power plant. Responsibilities included Arc Flash Hazard Analysis Calculation, Balance-of-Plant (BOP) Protective Device Coordination Calculation including Setting Motor and Feeder Protection Relays Siemens Siprotec Relays, and Differential Relay Setting Calculation.

Allegheny Energy
Responsibilities included modeling for Arc Flash Hazard Analysis using SKM software.

O&G Industries, Inc., Kleen Energy Systems Project - Design of a New Combined Cycle Plant
Assisted the lead electrical engineer in design of a combined cycle power plant. Responsibilities included Ground Grid Calculation, Engineering Requisitions, Specifications, Development of Medium and Low Voltage One-Lines, Protective Device Coordination and relay programming GE relays.
<...

Login or Register to view the full resume.