K.Doan

2/13/2015
Santa Ana, CA

Position Desired

Civil Engineering
Anywhere in the U.S.
Yes

Resume

K.Doan, E.I.T. Civil Engineering
5403 W. Davit Ave. Santa Ana, CA 92704
Mobile: (714) 589-6857
Home: (714) 554-5841

OBJECTIVE
Seeking a fulltime opportunity as an Entry-Level Civil Engineer. Planning on obtaining a Professional Civil Engineering License in three years. Would like to apply learned skills from academics, work, and self-taught in order to become a productive member of the hiring firm.

EDUCATION
BS in Civil Engineering, California State Polytechnic University, Pomona. Graduated: December 7, 2012
GPA: 3.23

WORK EXPERIENCE
Public Transit Intern, City of Anaheim – Public Works, Transit Department (Fall 2011- May 2012)
• Organized agreement documents.
• Created Cost Estimates for projects and grants.
• Assisted planners with presentations.

AFFILIATIONS
• Cal Poly Pomona - Chi Epsilon
• SEACPP – Structural Engineering Association Cal Poly Pomona
• ASCE – American Society of Civil Engineers
• Cal Poly Pomona – ASCE Steel Bridge Team Competition (2010-2011)

SKILL/KNOWLEDGE
• Microsoft Office (Excel, Words, Power Point) -Expert
• Adobe Photoshop-Intermediate –self-taught
• Bentley MicroStation/Inroad-Expert
• AutoCAD Civil 3D-Expert
• Bentley WaterCAD – Intermediate – self-taught
• Synchro/Vissim/HCS - Intermediate
• Program languages: C++, Java, Visual Basic – Intermediate - self-taught
• SAP2000 - Intermediate
• Structural Analysis and Design (Steel, Wood, Concrete)
• Hydraulics/Water Management/Hydrology Engineering
• Highway and Transportation Engineering
• Railway Engineering
• Watershed Restoration Design
• Project Management
• Language: English/Vietnamese

PROMINENT ACADEMIC CIVIL ENGINEERING PROJECTS
• Senior Project Design – Crenshaw/LAX Transit Corridor.
Design a below grade fixed-guideway system along Crenshaw Blvd. as part of the Crenshaw/LAX Transit Corridor Project.

 Created Project Schedule
 Research and organized data regarding existing conditions.
 Research and obtain geology data of the region.
 Created a detailed hazard analysis of the region.
 Obtained subsurface conditions of the site.
 Sorting out and obtaining relevant data from site testing.  Calculate the stress and loading conditions of the site.
 Design the transition structure, calculate the excavation volumes and cost estimate.
 Design the below-grade guide-way Structure.
 Create a 3D model of the project.


• Water Treatment Plant Renovation Design – Redesigned an innovative water treatment plant for the Three Valley Water Municipal Water District to meet with future demands for the region.

• Detention Basin Design – Design a new basin in the area of Lake Elsinore to help store and manage the water coming in...

Login or Register to view the full resume.