OBJECTIVE
Position requiring technical services and/or management skills.
QUALIFICATIONS
• Technical Director
• Operations Manager/Plant Manager
• Involved in startup of manufacturing facilities from groundbreaking to plant
expansion
• Engineering design, AutoCAD, process engineering, equipment design, and patent
processing
• PLC programming (Modicon, Allen Bradley, Reliance DCS5000, and industry
IBM compatibles)
• AC/DC variable drives (Allen Bradley, ABB, and Toshiba)
• Maintaining mechanical, hydraulic, steam, and pneumatic controls
• Quality control
• Lean Manufacturing process implementation
• Capital expansion control
• Safety management
• Supervision of production levels
• Management of personnel
• Inventory control
• Purchasing equipment
• Budget projections and management
• Scheduling production
• Environmental management
• Management information systems
• Personal computer operation using Microsoft Office (Excel and Word)
• Familiar with the following equipment brands and I/O: Modicon (PLC); Allen
Bradley (PLC, Variable Drives, Various I/O Devices); ABB (Variable Drives);
SMC (Pneumatics); Honeywell; Hydraulic Valves/Cylinder Systems; Temposonic
I/O; Cutler Hammer; 4-20ma Controls; 0-10 volt Controls; 110 vac I/O and
controls; 480 vac three phase: Motor Starters, controls, and facility power
distribution systems
WORK EXPERIENCE
Bakers Creek Wood Floors (Division of Home Legend Mfg.) Edwards, Miss. 2007 to Present
Technical Director
Engineer process design and layout of electrical, mechanical, and control functions for manufacturing plant.
Use AutoCAD to provide equipment design and layouts as well as product specifications.
Troubleshoot and maintain process controls utilizing equipment documentation, schematics, etc.
Utilized RSLogix for PLC programming: Multiple PLC’s linked throughout operation for data transfer and programming adjustments.
Purchase equipment and parts when needed.
Design and put into operation equipment implementing a new process involving sawn face plank lay-up with a reactive hot-melt system.
Capella Wood Floors (Division of Armstrong World Industries) Vicksburg, Miss. 2006 to 2007
Operations/Production Manager
Maintained safety, quality, and efficient production in an engineered wood flooring operation.
Communicated with departmental supervisors daily regarding departmental budgets and scheduling requirements.
Worked with Corporate Product Development teams regarding new products and their design.
Provided technical support when needed.
Capella Wood Floors (Formerly Anderson Tully Engineered Wood) Vicksburg, Miss. 2004 to 2006
Manufacturing Vice President
Responsible for manufacturing engineered wood flooring, veneer, and hardwood panels.
Maintained communication throughout operation regarding departmental requirements.
Worked with product research and development.
Provided technical support when needed.
Anderson Tully Engineered Wood Vicksburg, Miss. 1999 to 2004
Operations Manager (2000 to 2004)
Responsibilities included process design, equipment order, cost management, plant startup, environmental emission calculations, Technical Support/R&D, and maintaining communications throughout operations.
Process Engineer (1999 to 2000)
Established departm...
Login or Register to view the full resume.