Terry

4/28/2014
Knoxville, TN

Position Desired

Other Engineering
Anywhere in the U.S.
Yes

Resume

Terry W. Harrison
312 Uhdali Place Loudon, Tennessee 37885 (865) 635-1618

Objective
Objective includes obtaining a senior level project controls position in the Engineering, Procurement, and Construction areas where demonstrated skills and experience will contribute to profitable operations for the company. Career goals include being a major factor of a project team leading to positive job achievements and successful and safe project completions.
Profile
An accomplished professional with comprehensive experience and knowledge of project controls that can assist in engineering, procurement, outage, construction and commissioning planning phases with experience in Nuclear, Fossil Fuels, and Petro-Chemical projects. Proactively assess progress and completion forecasts and provides solutions to mitigate unfavorable circumstances or to optimize project objectives. Other skills include project planning and estimating for initial schedule development, negotiating and coordinating scheduling and cost requirements between contractors and subcontractors. Management and Supervisory experience in project and organizational based teams.
Skills Summary
• Performs schedule development, maintenance, and monitoring activities
• Performs data analysis, identifies problems, and makes recommendations
• Assists in the development and execution of earned value trending and reporting
• Supervises and provides technical direction for planning / scheduling and cost engineering when delegated
• Assists in developing unit man-hour and pricing data for specific disciplines or other specialties, including estimating parameters, factors, indices, productivity and craft distribution reference data, etc. based on analysis of industry experiences (Timberline and Cobra Estimating Software)
• Develop and Deploy Project / Program Earned Value Management Systems
• Monitors schedule deviation / proposes corrective actions for project variances
• Assists in the development of KPI’s (Key Performance Indicators)
• Assists in the development of Project Deliverables (Internal / Customer based)
• Develops quantity release or installation curves for assigned disciplines or specialties
• Executive Level / Project Level Dashboard Development
• Assists in leveling decisions
• Assists in cash flow reporting / leveling
• Performs deliverable / quantity manpower loading for assigned schedules & projects
• Develops expert level custom Crystal Reports
• Advanced Excel / VBA / Code Query Builder / Automated Metric Development
• Current Unescorted Nuclear Access
Professional Employment Experience – History
TENNESSEE VALLEY AUTHORITY / BROWNS FERRY NUCLEAR STATION ATHENS, ALABAMA. 10/2012 – CURRENT. Lead Project Scheduler / Project Controls Specialist Responsible for the detailed schedule development, analysis and preparations for weekly updating cycles for the NRC 95003 Readiness Inspection Initiative. Experience with schedules in excess of 10,000 + activities. Advanced Oracle Primavera P6 vers. 7 Excel, Access, Power Point, Adobe, and Maximo software programs utilized.

FIRSTENERGY GENERATION / DAVIS BESSE NUCLEAR STATION OAK HARBOR, OHIO 8-2012 – 10/2012 Steam Generator Replacement Lead Schedule / Trend Analyst (Owners Oversight Representative)
Responsible for the detailed schedule development, analysis and preparations for weekly updating cycles for the Engineering, Design, and Installation of the Steam Generator project (OTSG) for unit one. Responsibilities include preliminary project cost / WBS, and detailed schedule development. Responsible for project cost tracking and development of Project SPI /CPI, Performance KPI’s and updating / revising the Project Spend Plan. Responsible for the development of Executive level Dashboards and metrics for specific project areas in regards to progress, performance and financial performance. Performed oversight on the development of multi discipline schedules for modifications and refueling outage windows in accordance with applicable procedures and scheduling guidelines. Experience with schedules in excess of 30,000 plus activities. Oracle Primavera 6.0 vers.7 utilized, along with Excel, Access, SAP, Maximo, Power Point, Business Objects, and Adobe programs.
TENNESSEE VALLEY AUTHORITY / WATTS BAR NUCLEAR STATION SPRING CITY, TN. 3/2012 – 8-2012 Lead Project Controls Coordinator. Developed and implemented methods for performance monitoring, reporting, analysis, and trend assessment. Facilitate programs to ensure establishment and analysis of specific operational and process improvement plans used for goal setting, estimating project plans, performance indicators/targets, benchmarking, baselining, and trending, including tracking daily cost/progress/earned value/CPI/SPI, spend plans and EACs. Coordinate Engineering A/E contracts, monitor contract expenditures for usage trends, assist in the process of issuing new contracts, amending existing contracts, and resolve questions, issues, etc. Lead/manage the process ensuring the integrity of the process, resolving pending/outstanding requests, reconciling encumbrances and pending tasks with IBS as required. Experience with schedules in excess of 10,000 + activities. Primavera P3 and Advanced Oracle Primavera P6 vers. 7 Excel, Access, Power Point, Adobe, PeopleSoft, Maximo, Business Objects, and Passport software programs utilized.
SOUTHERN COMPANY NUCLEAR OPERATING – BIRMINGHAM, ALABAMA 11/2011 – 3/2012
Contracted ESS Primavera / Maximo Nuclear Fleet Analyst for Daily On-line and Outage Scheduling. Responsible for fleet analysis of work and asset management scheduling supporting three (3) operating nuclear stations. Perform analysis of schedule baselines, and producing forecast analysis reporting. Develop tracking and trending of project status; anticipate problems and advise team of issues / metric development; perform variance and critical path analysis. Responsible for developing Fleet Performance Indicators for Fleet Scheduling performance areas such as Scope Stability in T-minus timeframes, Emergent Work, Schedule Adherence, and Schedule Stability according to INPO Standards 97-005, AP-928, and AP-925. Act as a consultant to the project team for scheduling and work management issues. Experience with schedules in excess of 15,000 + activities. Advanced Oracle Primavera P6 vers. 7 Excel, Access, Power Point, Adobe, PeopleSoft, Maximo, Business Objects, and Passport software programs utilized.

MITSUBISHI NUCLEAR ENERGY SYSTEMS – FORT MILL, SOUTH CAROLINA 5/2011-10-2011
Lead Project Scheduler for the North Ana Unit 3 USAPWR Project. Ensure that the Project Master Schedule complies with Contractual and Quality Control / Quality Assurance programs and procedures. Developed and maintained Project Controls processes and desktop guidelines for all in-house and subcontractor partners. Responsible for the adherence and utilization of the project Work breakdown and Cost breakdown components and usage. Attention to detail including critical path analysis, work flow analysis, resource leveling and cash flow analysis (SAP), but not limited to the following;
• Planning, coordinating, and managing all schedule and cont...

Login or Register to view the full resume.