take-charge person, Capital Project Manager, Mechanical Engineer, bilingual MBA graduate seeking to work with a team in a manufacturing environment to improve processes, lower cost and facilitate organizational growth. Offering manufacturing expertise in Pharmaceutical, Food and Chemical Industries; specializing in multiple and often simultaneous responsibilities for project management, maintenance and health and safety. Ideally, this position would greatly benefit from high level insights and extensive experience in engineering and project management in varied regulated industrial scenarios.
Areas of Expertise:
Each function below required collaborative work with several departments and with all levels of organizations:
„« Maintenance Management
„« Capital appropriation process management and budgeting. Documenting projects for approval
„« cGMP , CAPA, FMEA
„« Change controls, SOP Development & Training, test protocols, validations IQ/OQ/PQ. URS, FAT¡¦s
„« Lean Manufacturing (TPM, SMED, 5¡¦S, Value Stream Mapping, Six Sigma)
„« Behavior Observation Systems (STOP), Safety Audits, HAZAP, safety Committee Member, lockout-tagout, confined space, hot work order system
Special Skills
English _ Native,
Spanish _ Native,
MS Project,
AutoCAD,
Professional Experience
Teva Animal Health- Bayer HealthCare Apr 2012 - To Date
„« Response to production Issues requiring Engineering Support
„« Engineering Studies of APA filling lines
„« Support Capital Plan by execution of engineering projects such as the installation of a 200 ton chiller.
Temptime Corporation, Morris Plains NJ 2005 - Feb 2012
Product lines consist of specifically formulated, visibly readable TTIs for the health and food markets.
Project Engineer, Maintenance Manager
„« Led, directed and supported the Project Engineering and Maintenance department and was part of the Safety Committee
„« Analyzed and evaluated manufacturing processes to develop/implement process and product improvements in accordance with ISO and GMP standards. One such project reduced active ink manufacturing process from a three to a one day process
„« Defined and wrote User Requirement Specification (URS) for facility and equipment projects.
„« Wrote Functional Specifications, Factory Acceptance Test, Change Control Validation Plans and IQ, OQ/PQ documentation for process, and inspection equipment
„« Defined, implemented and managed the capital expenditure process. The Appropriation Request System facilitated alignment of capital expenditures with strategic goals. Created an SOP for Specification of Business Needs, Appropriation Request presentation and project evaluation
„« Installed thermal oxidizer for the control of VOC emissions giving the company ability to run production at greater rates during multiple shifts maintaining compliance with emissions limits. This project was implemented in record time, within budget and meeting all scope requirements
„« Coordinated efforts of internal and external resources to meet EPA and local building code requirements
CCL Custom Manufacturing, Cumberland, Rhode Island 2004 - 2005
Project Engineer
„« Project management in packaging, compounding and utilities in an aerosol production facility
„« Executed capital projects in packaging, process and bulk material storage
„« Redefined packaging line layouts, installed product fillers, shrink wrapping, can cappers and case loading equipment
„« Installation of process vessels and storage tanks.
Georgia Pacific, Parchment Michigan 1999 - 2001
Paper-converting / wrap material
Project Engineer
„« Documented capital projects for corporate approval
„« Focused cost estimates, financial and technical feasibility and specificatio...
Login or Register to view the full resume.