OBJECTIVE
To obtain an electrical/mechanical position in a company that analyze, design, and manufacture equipment based on the combination of electrical/electronic circuits and mechanical systems.
EDUCATION
Bachelor of Science, ElectroMechanical Engineering May 2013
Wentworth Institute of Technology, MA 3.0 GPA
TECHNICAL SKILLS
Devices: Texas Instrument MSP430, Ardunio, Oscillscope, Signal Generator, Digital Multi Meter, Amp Meter
Experience in: MATLAB, AutoCAD, SolidWorks, LabView, Revit, Working Model, PSpice, C++, MS Word, MS Excel, MS Powerpoint
RELEVANT EXPERIENCE
Electrical Engineer Intern, WSP Flack & Kurtz, Boston May 2010—Sept 2012
• Designed, drafted, and documented building’s electrical systems using AutoCad MEP software
• Developed Autodesk Revit Skills that used Building Information Modeling (BIM), to help drive accurate design and analysis of buildings with both parametric 3D modeling and 2D drafting
• Survey, field work, collect data, and drafted CAD drawings of new and pre-existing project sites
• Calculated and evaluated panel board schedules, circuit wiring diagrams, single or three phase transformers, load calculations, and voltage ratings for electrical systems
• Facilitated meetings with project team, architects, clients, and other trades (Mechanical, Plumbing, Security, and Fire Protection) to discuss cost, budgeting, inquires, and track progress of projects
• Collaborated with electrical engineers to discuss electrical codes & regulations using National Electrical Code (NEC) and National Fire Protection Association (NFPA) manuals for various building applications
• Completed pre-design and electrical calculations for a variety of projects, such as MIT Building E17/E18, MassPort, Harvard, Massachusetts Bay Transportation Authority (MBTA)
Engineering Intern, Stop and Shop, Quincy Jun 2009—Aug 2009
• Drafted CAD floor plans for new or remodeled stores so that new refrigeration and electrical systems could be applied and tested
• Contacted vendors, suppliers, distributors to order refrigeration components and specifications
• Survey developing project sites and completed progress reports for all refrigeration systems in building
Marke...
Login or Register to view the full resume.