Objective: Fill a position at a nuclear facility as a Containment, Drywell, or Turbine building coordinator, Project manager, or Field Engineer.
Skills
Managed multidiscipline projects which include but are not limited to, High Pressure turbine, and reactor steam dryer replacement, Containment, Turbine, and Drywell coordination, training, resolve design and construction problems, estimating, plan and schedule projects, performing material take-off, drawings for construction, Monitor installation for compliance with specifications, Develop construction and fabrication techniques. Coordinate multi discipline implementation.
Experience
2010-2012 Entergy Operations, Inc. Grand Gulf Port Gibson, MS.
Project Manager
• Established a schedule With Siemens to design and fabricate a new high pressure turbine to support the power up rate refuel outage.
• Established a schedule With GE to design and fabricate a new Reactor steam dryer to support the power up rate refuel outage which included a contract with Westinghouse to cut-up and remove the old steam dryer.
• Established an implementation schedule for the HP turbine and the reactor steam dryer. .
• Containment coordinator during outages.
2009-2010 Entergy Operations, Inc. Waterford 3 Killona, LA.
Field Engineer
• Resolve field issues associated with ICI thimble modification during RF outage.
• Coordinate dive activities with containment coordination.
2008-2009 Energy Northwest Richland WA.
Project Manager / Turbine Floor Coordinator / Engineer
• Resolve technical issues that challenge the schedule and budget
• Coordinate activities within system outages.
• Perform walk-downs to identify possible implementation conflicts.
• Support the 12 week work schedule.
• Coordinate activities on the Turbine floor to support the outage schedule.
2005-2008 Entergy Operations, Inc Waterford 3 Killona LA.
Employees Concern Coordinator
• Perform interviews for investigating concerns.
• Provide feedback from addressed safety concerns both up and down the organizational ladder.
• Provide Recommendations from investigations to resolve concerns using available information.
• Investigate allegations to determine if they can be substantiated or not.
• Communicate with all levels of Management
• Containment coordinator during outages.
2001-2005
Materials Purchasing and Contracts Supervisor
• Supervise Warehouse hourly personnel and Salary procurement specialist.
• Organize staff priorities to meet plant Priorities.
• Provide engineering knowledge to enhance quality receipt inspections
• Over see work performance both good and poor then provide immediate feedback and document results.
• Support and organize resolution to warehouse, material receipt and procurement (purchasing) problems.
• Manage staffing and work hours to support plant activities as well as meeting refuel milestones and supporting special projects.
• Containment coordinator during outages.
1990–2001
Project Manager and Senior Engineer
• Construction Supervisor in various disciplines providing engineering expertise and support during refuel outages and forced outages.
• Implement modifications by coordinating, managing estimates, schedules, design, and testing.
• Made determinations for Capitol project verses O...
Login or Register to view the full resume.