Nineteen years of experience in the management and construction of complex heavy engineering projects.
EDUCATION
Bachelor of Science in Civil Engineering 1994
California Polytechnic University
Pomona, CA
E-I-T Certification 1999
Passed 8 hour Portion of California P E Exam
EXPERIENCE
Project Manager
Norman A. Olsson Construction, Inc. 2011 to 2013
Engineer
J.F. Shea Construction, Inc. 2003 to 2011
Estimator / Project Manager
KIP Incorporated 1999 to 2003
Lead Project Engineer
Shea – Advanco Constructors 1995 to 1999
Field Engineer
Peter Kiewit and Sons 1994 to 1995
Maintenance Engineering Intern
Orange County Sanitation District 1990 to 1994
PROJECT DESCRIPTION
Norman A. Olsson Construction, Inc.
12-2011 to 03-2013
• Third Centrifuge Addition and Digester 4 and Centrate Piping Rehabilitation
Encina Wastewater Authority $3,200,000
Project Manager – Installation of centrifuge and appurtenances and rehabilitation of digester piping.
J.F. Shea Construction
01-2004 to 09-2011
• Sunflower Pump Station Auger and Trough Rehabilitation
Orange County Sanitation District $670,000
Project Superintendent – Remove, rehabilitate and replace 108” screw auger. Remove and replace existing trough grout. Remove and replace deteriorated concrete and coatings in pump station effluent channel.
• CenGen Drain Improvements
Orange County Sanitation District $100,000
Project Superintendent – Modification of existing 8” and 4” CenGen drain system including the installation of new flow meter.
• Plant 2 Headworks Replacement
Orange County Sanitation District $198,000,000
Mechanical Superintendent – Installation of Bar Screen Facilities; finalize installation, start up and operation of grit pumps, grit classifiers and truck loading, screenings compactors and truck loading, slide gates and operators, and odor control facilities.
• Steve Anderson Lift Station
Orange County Sanitation District $29,000,000
Start Up and Commissioning – Supervise installation and coordinate start up of four variable speed 20 MGD sewage pumps and two constant speed 12 MGD sewage pumps with accompanying variable speed drives. Start up, testing and commissioning of 70 MGD sewage lift station including all punch list items.
• CEMS Improvements
Orange County Sanitation District $1,715,000
Project Superintendent – Upgrade the emission control systems on existing engine generator systems involving mechanical piping, structural modifications and additional structural steel work platforms.
• Rehabilitation of Activated Sludge Systems
Orange County Sanitation District $10,121,785
Project Superintendent – Replacement of slide gate operators, sluice gates, weirs, HVAC, odor control, replacement of aeration basin impellers and miscellaneous mechanical, structural and civil items of work.
• Oil Well Location and Abandonment
Orange County Sanitation District $265,000
Project Superintendent – Locate eight abandoned oil wells inside treatment plant, remove existing abandonment cap and lower to new elevation.
• Biosolids Storage Odor Control Facility
Los Angeles County Sanitation District $17,639,697
Project Engineer – Remove and replace top section of Biosolids Storage Facility. Construct air scrubber structure, install foul air ducting and fans, test and start up mechanical and electrical systems.
• Carson Secondary Treatment Facility
Los Angeles County Sanitation District $73,943,640
Project Scheduler and Field / Quality Control Engineer – Update existing reactors and clarifiers by replacing all piping and electrical, remove and reinstall all equipment after hydro-blasting and resurfacing 1.2 million SF of concrete surfaces with shotcrete and epoxy coatings.
KIP Incorporated
01-1999 to 01-2004
• Installation of Complete Storm Drain Systems
Centex Homes, Pulte Homes, Riverside Co. Flood Control District $50K - $2M
Installation of complete strom drain systems including cast in place pipe, RCP, and structures. Perfo...
Login or Register to view the full resume.