PLANT ENGINEER
Plant Engineer with 15+ years of extensive technical and managerial experience in diverse manufacturing environments, including pharmaceuticals, semiconductor, and consumer product manufacturing. Impeccable track record in project management, personnel leadership and talent acquisition. Expertise in implementing cost effective solutions for manufacturing, maintenance, facilities, and automation systems.
AREAS OF EXPERTISE
Equipment Support
Process Development
Quality Testing
Lean Manufacturing
Validation and Compliance
Long Range Plans
Total Productive Maintenance Required Resources
Project Management
Technical Support
Multi-Disciplinary Teams
Strategy Implementation
Remediation Strategy
PROJECT LEADERSHIP ¡V Implemented temporary manufacturing facility in 90 days. Project lead collaborating with corporate engineering in design, construction, installation, and start-up of 380,000 square feet manufacturing facility, with completion in 1 year.
TEAM MANAGEMENT ¡V Lead professional engineers, supervise, maintenance technicians, electricians, and material coordinators, etc, ensuring successful completion of projects within budgetary and time specifications
OSO BIO PHARMACEUTICALS, ALBUQUERQUE, NM 2010 ¡V PRESENT
CAPITAL PROJECTS / PLANT ELECTRICAL / FACILITIES ENGINEER
Lead demolition and reconstruction of Class 10,000 and Class 100 clean rooms and pharmaceutical equipment installation. Responsible for installation of new pharmaceutical washing, dehydrogenation and filling equipment. Supervise plant power distribution standards and practices: thermal scan, switch gear maintenance and repair.
Manage 3 professional engineers, 2 cad operators, pipe fitters, electricians, and project technicians
Lead development project of Basis of Design for new facility addition along with team of professional engineers and senior manufacturing staff
Specify and direct installation of 275 kW stand by power system
Develop and implement capital, and expense projects for facilities and process improvement
Supervise bi-annual recertification of Pharmaceutical clean rooms and systems
Project lead for design, installation /startup of HEPA system for Class 100 clean room
Redesign of effluent waste water treatment mechanical and electrical systems
Plan, and organize reconstruction of Class 10,000 compounding clean rooms for processing
MASCO BUILDER CABINET GROUP, LOS LUNAS, NM
2005 2009
ENGINEERING SERVICES MANAGER
Directed plant wide electrical power distribution system design and installation, and managed over-site for construction of 380,000 square foot facility. Designed electrical systems controls interface for multiple machine platforms. Directed maintenance of HVAC, environmental and facilities factory support systems.
Formulated and administered $1.4 million dollar operating budget
Supervised 10 maintenance technicians, maintenance supervisor, material stores coordinator, and Environmental, Health and Safety officer
Awarded Manufacturing Maintenance Excellence¡¨ for outstanding maintenance operations
Reviewed and approved construction modifications / additions for plant construction
Improved quality product manufacture, by redesigning manufacturing equipment fixtures and assemblies
Oversaw professional engineers, cad operators, machinists, pipe fitters, electricians, and project technicians
Authored plant power distribution preventive maintenance standards and practices, and ensured Environmental Compliance
Served as Lead member of Emergency Response Team
U.S. COTTON LLC, RIO RANCHO, NM 200 2005
MANUFACTURING MAINTENANCE MANAGER
Concurrently responsible as a technical resource for Process Engineering machine modifications and improvements. Managed and directed cad operators, machinists and project technicians.
Formulated and administered $1.2 million operating budget
Saved $20,000 per year, by identifying and implementing solutions for scaling of humidification systems
Supervised 5 project technicians, 16 maintenance technicians, and material stores coordinator
Eliminated out of specification manufacturing criteria, by developing Allen Bradley SLC 500 control automation for humidification control for plant manufacturing
Increased product quality and material throughput, by redesigning stamping press control automation
Designed 150 hp compressed air and storage system for plant facilities
SUMITOMO-MITSUBISHI INC., ALBUQUERQUE, NM 2001 2002
STAFF ENGINEER / MANUFACTURING MAINTENANCE MANAGER
Directed operational over...
Login or Register to view the full resume.