Pedro L. Santiago, MECE, PE
Apt. 6E Laguna Gardens 4, Laguna Avenue, Isla Verde-Carolina Puerto Rico, 00979 Cellular: (787)
473-8046
Profile
Project Manager with more than ten years of supervisory, business development and construction
management
experience for owner’s representative and general contractor. Broad based responsibilities in
construction management and construction engineering projects, with experience in architectural and
engineering (A&E), engineering and construction (E&C), Mechanical installations for the Water and
Sewer Authority and other clients. Comprehensive experience with residential, commercial,
industrial, water and wastewater projects. Strong structural, geotechnical, leadership and
business development skills.
Education
Master of Engineering in Civil Engineering
Polytechnic University of Puerto Rico, San Juan, Puerto Rico, June 2009
Bachelor of Science in Civil Engineering
Polytechnic University of Puerto Rico, San Juan, Puerto Rico, June 2003
Work Experience
Project Manager (Estimating, Scheduling, claims and Division Business development manager) (Mar/13
to present) – Bermudez, Longo, Diaz-Masso, LLC San Juan, PR- In charge of the the estimation of
multidisciplinary construction projects for the Hydrosanitary Division. Develop and review Lump
Sum, Unit Price and Design Build project estimates for government and private bids. Prepare,
schedule (baseline and updates) for the HS division. Support of the hydrosanitary division’s,
identification of changes in scope of work, documentation process and claims fo the ongoing
projects.
Project Manager (Jan/12 to Feb/13) – Bermudez, Longo, Diaz-Masso, LLC San Juan, PR- Manage
multidisciplinary construction projects. Develop and review project estimates for government bids.
Prepare equipment purchasing analysis, cost projection reports, schedule (baseline and updates),
RFI request for information and others. Preparation and identification of changes in scope of work,
process and deliver change orders. Managed projects with short time frames, tight schedules and
within budget.
Project Engineer (May/07 to Dec/11) – Bermudez, Longo, Diaz-Masso, LLC San Juan, PR- Managed
multidisciplinary construction projects. Developed and reviewed project estimates for government
bids. Prepared equipment purchasing analysis, cost projection reports, schedule (baseline and
updates), RFI request for information and others. Preparation and identification of changes in
scope of work, process and delivered change orders. Managed projects with short time frames, tight
schedules and within budget. In charge of the project management and the supervision of employees,
between 4 and 80, including, electrical engineers, mechanical engineers, Quality/Safety engineer,
project secretary, supervisors, foremans, equipment operators, mechanical foreman, labors,
carpenters, pipe layers, group leaders among others
Project Inspector (Aug/04 to May/07) - LMC & Associates, San Juan, PR Project management, scope
included evaluation of proposals and revising contractor monthly certification. Inspected
residential projects. Technical inspection work included concrete pouring, roadway construction,
earth movement, site infrastructure (storm sewer, water pipe, sanitary and electrical).
Structural Design Engineer (Jan/04 to Apr/04) and (Jan/12 to Mar/12)-Independent Contract, Toa
Baja, PR and Guaynabo Seismic load calculations based on UBC 97, structural analysis and footing
structural design. Structural Analysis and project manager for the design of a 2 story steel
building, permits, drawings, Etc.
Professional Membership
Puerto Rico Professional Engineer (PE) License number 21238 (Reciprocity in the US)
Recent Projects
Caguas Norte Compliance, Caguas, PR, Ugrade for compliance, concrete tank construction, process
piping
installation and tank mechanical installations for new and existing tanks. Construction cost, 6.2M.
Improvements to Villamar Carolina Storm Sewer System, Carolina, PR, Municipality residential storm
sewer project,
installation of 30 and 60” Pre-stressed and concrete pipe. Construction cost, 1.3M.
Super Aqueduct Additional Air Vent, Arecibo, PR, Installation 3 additional air vent system for the
superaqueduct 72” pre-stressed concrete pipe. Construction cost, $167,000.00.
Water System Optimization, Humacao, PR, Installation of 20 Air Vents, and three pressure relief
Valves in 3” thru 14” in diameter. Construction (ARRA funds) cost, $297,000.00.
La Plata Dam Raw Water Pump rehabilitation, Toa Alta PR, Installation of 2 electrical motorized
pumps of 20MGD each and other mechanical process valve installation. Construction cost 6M.
84” end cap Emergency- La Plata, Toa Alta...