Objective: To obtain a full time position in the field of or related to Environmental Engineering.
Education: Michigan Technological University (MTU)
Houghton, MI
Major: Environmental Engineering, B.S.
Expected Graduation: December 2013
Minor: Municipal Engineering
Certificate: International Sustainable Development Engineering
GPA: 2.63
Departmental GPA: 2.82
WORK HISTORY
• Environmental Engineer Intern, United States Indian Health Service, Sioux City, IA. (Summer 2013)
Design domestic water and wastewater systems. Draft contract documents, specifications, and construction plans. Assist in soil and site surveys and conduct engineering feasibility studies. Provide surveying, drafting and engineering assistance to office engineering staff on various projects. Serve as on-site construction observer for water and sewerage projects to ensure projects are constructed to specifications.
• Referee Manager, Michigan Tech Broomball, Houghton, MI. (April ‘12 – April ‘13)
Schedule and conduct training, payroll, and games for over 70 employees.
• Wildlife Technician, Advanced Wildlife Control, Swartz Creek, MI. (Jan. ‘04 – Sep. ‘09)
Removing nuisance animals from residential and commercial properties.
ENGINEERING PROJECT EXPERIENCE
• Quebrada Arena Community Water System, Cerro Piedra, Panama. (August 2013)
Conducted water quality assessment and land survey for a community aqueduct system in rural Panama within the Ngöbe – Buglé Comarca.
Coordinated project with a multi-disciplinary team of engineers and Peace Corps Volunteers. Design and feasibility of the distribution system, alternatives, cost estimates, and construction manual will be completed by December 2013.
• Community Sewer Force Main Replacement, Sioux City, IA. (Summer 2013)
Designed using AutoCAD Civil 3D a sewer force main and lift station pump replacement.
Processed contractor submittals and NEPA paperwork for the project.
• Residential Water and Wastewater Systems, Sioux City, IA. (Summer 2013)
Designed using AutoCAD Civil 3D sewer and water systems for multiple residential sites.
Drafted construction drawings, specifications, and contracts, as well as oversaw implementation of the systems.
Conducted engineering feasibility studies including design alternatives and cost estimates.
• Packed Air Stripping Tower, Houghton, MI. (Spring 2013)
Conducted pilot scale air stripping tower to remove chloroform contaminant in groundwater. Designed full scale implementation of the treatment process.
• Granular Activated Carbon Process, Houghton, MI. ...
Login or Register to view the full resume.