Mick

9/20/2014
Scottsdale, AZ

Position Desired

Project Engineering
Anywhere in AZ
Yes

Resume

PROFESSIONAL SUMMARY

Ms. Nee has more than 20 years of professional experience working for A&E firms. Design phase assignments and responsibilities have included serving as project manager or project engineer for municipal and private sector water and wastewater projects; coordinating all design disciplines; developing plans and technical specifications; working with regulatory and permitting agencies; performing master planning services, system modeling, and feasibility studies; researching potential treatment options; preparing process material and energy balances; performing site evaluations; reviewing shop drawing submittals and factory functional testing; estimating construction costs; and operating an advanced wastewater treatment pilot plant. Construction management responsibilities have included project bid phase services; contract preparation and negotiation of revisions; scheduling; logging and responding to RFIs; project inspections and reviews; contractor supervision and coordination; and project close-out.


PROFESSIONAL HISTORY:

PROJECT CONTROLS MANAGER • ECOtality North America 2010 to Present
(The EV Project: A national study on EV use and charging infrastructure deployment)

SR. PROJECT MANAGER • Burns & McDonnell 2005 to 2009
(Aviation & Facilities: Managed system-wide projects/programs for US Airways Corporate Real Estate Department)

SR. PROJECT MANAGER • Parsons Corporation 2000 to 2005
(Environmental: Managed several major water and wastewater projects)

SR. CHEMICAL ENGINEER • Stanley Consultants, Inc. 1997 to 2000
(Environmental: Managed several wastewater projects)

PROJECT ENGINEER • Black and Veatch 1989 to 1996
(Facilities: Designed process piping and HVAC systems for clean rooms; managed water reclamation project)


EDUCATION:

Master of Science Candidate in Environmental Engineering
ARIZONA STATE UNIVERSITY • TEMPE, AZ

Bachelor of Science in Chemical Engineering
KANSAS STATE UNIVERSITY • MANHATTAN, KS

REGISTRATION:

Registered Professional Engineer (Chemical) 1996
State of Arizona Certificate Number 30482



PROFESSIONAL ACCOMPLISHMENTS:

WATER SUPPLY AND TREATMENT

• HITE MARINA 1-MGD SURFACE WATER TREATMENT PLANT – Managed the plant design which included pre-filters, micro-filtration units and granular activated carbon filters. The fully automated system included a sodium hypochlorite dosing system and was successfully completed on a fast track schedule.

• SOUTHERN NEVADA WATER AUTHORITY WATER RESOURCE DEVELOPMENT PRELIMINARY FACILITIES – Designed wells, pipelines, pumping stations, reservoirs, power lines, and related supporting facilities for the transmission of groundwater resources from various hydrographic basins.

• MISSION VALLEY EAST LIGHT RAIL TRANSIT PROJECT – Designed 6-miles of light rail extension for the Metropolitan Transit Development Board in the City of San Diego. Tasks included realignment of the waterlines ranging in size from 10-inches to 54-inches in diameter crossing the 6-miles of light rail transit.

• CITY OF SCOTTSDALE 10-MGD PUMP STATION NO. 126 – Managed the design including five 250-hp variable speed vertical turbine can pumps for the City of Scottsdale. The design of approximately 1.5 miles of 36-inch diameter force main was also included in this project.

• 1-MGD MICROFILTRATION SYSTEM – Designed installation for a 700-gpm 90M10C Memcor Microfiltration unit with auxiliary support systems, two pump stations, automated clean-in-place (CIP) system, microprocessor, and computer work station. System design included Central Arizona Project (CAP) feed water source, backwash pump station, discharge to CAP water treatment plant reservoir with integrated bypass sewer, CIP containment vault with drain to sewer, and filtrate pump station discharge to groundwater recharge wells.

WASTEWATER COLLECTION AND TREATMENT

• 1-MGD WAHWEAP WASTEWATER FACILITIES UPGRADE – Managed project for the National Park Service which included an emergency overflow structure, a gravity sewer, trash manhole, control structure, emergence overflow basin, 6-mile force main, force main bridge crossing, Wahweap lift station, Page lift station, leak detection system, force main to gravity sewer transition structure, odor control facilities, electrical system and instrumentation, telemetry system, and retirement of t...