BJ

7/21/2015
Richmond, KY

Position Desired

Project Engineering
Lexington, KY
Yes

Resume

ENGINEERING / MANUFACTURING / QUALITY / TECHNICAL / DESIGN / SALES / MILITARY

EXPERIENCE

GR Spring & Stamping Inc. (Richmond, KY) * (859) 625-5284 June 2012 – Present
Quality Engineer / Technician
o Deal with customers and any quality issues. (Benteler Automotive)
o Create and correct gage instructions, measurements, procedures and SWI’s for machine operators
o Lean Manufacturing projects - organizational
o Entry Level: Root Cause analysis, FMEA, PPAP, ECN

The UPS Store (Lexington, KY) * (859) 266 - 9806 November 2011 – August 2012
October 2000 – February 2006
Sales / Packing
o Packed and shipped items for customers in an office / retail environment.
o Printing, coping, notarized, and faxed documents.
o Familiar with UPS/USPS/DHL/Fed Ex packing and shipping documents and procedures

The United States Navy (SSBN 730 Henry M. Jackson) * (360) 396 -6668 / 6339 March 2006 – December 2010
Machinist Mate (Auxiliary Mechanic / Submariner)
o Worked with and troubleshot many mechanical and auxiliary systems; including plumbing, high pressure
air, hydraulic, diesel engine, atmosphere monitoring, oxygen, seawater and ventilation systems.
o Knowledge of Naval logistical computer systems and repair parts research, Quality Assurance, 3M and
procedures.
o Familiar with basic schematics, blueprints, piping and other engineering drawings.
o Trained with military security guard procedures and weapons, and causality training in firefighting,
flooding, toxic atmosphere and mechanical equipment causalities such as engine, pumps, and refrigeration
machinery in a nuclear power plant environment.

Technical Skills / Experience
o 2D & 3D CAD Software / Autodesk CAD / Solid Works / PC DMIS CMM Software / PLEX
o Microsoft Office: Excel, Word, Power Point
o Robotics Project
Troubleshot and programmed automated arms to build model airplanes in a manufacturing assembly line.
o Lean Manufacturing Activity for Toyota (2012)
Using lean tools to solve damaged grommets issues on the AR 4 cylinder engine for the Camry.
o Lean Manufacturing Project for GR Spring and Stamping (2013)
Organizing Stamping Press Dies for faster access and to improve upon overall product...

Login or Register to view the full resume.