Anna Karina Albano Luzardo
EXPERIENCE ALLEX Project Engineering. Air Liquide Process & Construction Inc. Houston, TX Aug 2013-Present •Working along with Engineering groups, local and global customer, Project Management, Administrative functions to complete GlobalFoundries Air Separation Unit Project in Malta, NY. •Participating with other E&C centers (ALE Japan) and customer (AL Electronics) to complete project. •Receiving technical questions and distributing them to the respective Engineering groups.
ALLEX Western Zone Engineering. Air Liquide Industrial U.S.LP Draper, UT Feb 2013-Aug 2013
•Assisted during planning of Turn Arounds (TARs), plant shutdowns, and other work concerning the operations and engineering of the Zone.
• Participated in the project management process, from needs identification, gap analysis, coordination of everybody's efforts, collided the results found, to deployment and closing.
ALLEX On-sites Operations. Air Liquide Large Industries U.S.LP Ghent, KY Aug 2012-Feb 2013
•Worked with operators and assisted during plant operations, plant shutdowns, and turn arounds.
•Gained knowledge about Air Separation Unit (ASU) and looked for ways to improve plant safety and efficiency.
•Monitored and investigated continuously crude Argon load in order to decrease its losses.
ALLEX Equipment Group. Air Liquide Industrial U.S.LP Houston, TX Jan 2012-Aug 2012
•Completed several elements of Quality Management System (QMS) to prepare for Internal Audit.
•Created design flow using Design Flow Solutions (DFS) for Blue Transport ALMA Project.
•Participated in several Factory Acceptance Tests (FAT) and a Process Hazard Analysis (PHA).
•Assisted Equipment Specialists with their Document Control and their projects’ parts lists.
Operations Management Leadership Program Intern. GE Healthcare, Troy, NY Summer 2011 •Worked to ensure an uninterrupted supply of materials between receiving and High Level Assembly. •Implemented Lean concepts and Supermarket rules to improve parts inventory in the receiving area. •Applied kitting concept; easy to pick, easy to move, easy to use, to improve time efficiency of parts. •Communicated constantly with Logistic Leader, Material Logistic Specialist, and logistic operators to acquire information about the area and material issues.
Early Identification Program Intern. GE Healthcare, Salt Lake City, UT Summer 2010 •Reported 10-day production cycle time and updated the P95 board with weekly cycle time. ...
Login or Register to view the full resume.