CERTIFICATION:

Engineer In Training (Idaho Engineer Intern), July 2012 - Present

Engineering Technical Staff Qualification, October 2014 - Present

Process Engineering Qualification, December 2015 - Present

Control Account Manager Qualification, October 2017 - April 2019

==========================================================
PROFESSIONAL EXPERTISE:

* Project Coordination, Analysis, Process Improvement, Problem Solving, Development of Strategic Initiatives and Requirements, Development and Management of Program/Requirements.

==========================================================
SOFTWARE/PROGRAMMING SKILLS:

* Microsoft Office Suite, Adobe Acrobat, VBA, Python, Simulink, Tableau, and WITNESS.

==========================================================
EMPLOYMENT HISTORY/EXPERIENCE

Washington River Protection Solutions, LLC in Richland, WA
Chemical Engineer: Waste Feed Delivery and Operations Planning
April 2019 - Present

Successfully supported one-of-a-kind Department of Energy complex initiatives, optimizing the RPP Mission Strategy:
*Developed process flowsheet supporting the repurposing of Tank 241-AP-106, a first-of-its-kind event that resulted in removal of 99.9% of the cesium within AP-106.
*Co-authored completion report for AP-106 Repurposing.
*Developed excel-based tools to model mission outcomes against acceptance criteria
*Performed prime analysis of qualification sampling data used in the "qualification package" for a 600K contract deliverable.

Washington River Protection Solutions, LLC in Richland, WA
Process Engineer: Mission Support
May 2018 - April 2019

Promoted from Associate Process Engineer II to Process Engineer:
* Fostered ORP initiatives and programs, such as development of an "Equipment Reliability" program.
* Developed system specification for Tank Side Cesium Removal (TSCR).
* Continued management of Central Engineering Control Accounts ($17.5 Million) as Control Account Manager (CAM).

Washington River Protection Solutions, LLC in Richland, WA
Associate Process Engineer II: Mission Support
July 2014 - May 2018

Successfully led fee-related projects, provided technical oversight to multiple subcontractors, and served as the Point of Contact for Engineering Strategic Planning, as an Associate Engineer:
* Led a two year technical study on bound organics in tank farm waste (meeting the “Excellent” criteria for Special Emphasis Area).
* Managed the update to two Waste Feed Delivery technical support documents.
* Point of Contact for Engineering Strategic Planning; supported extrusion and analysis for SY102 Core 334 series valued at $1M.
* Developed and coordinated scopes of work and provided guidance and oversight to two interns.
* Forged new path for procurement of standard engineering equipment, decreasing time for development of procurement specifications by two months.
* Coordinated with multiple WRPS organizations to develop an annual plan for tank farm sampling events.
* Author of Waste Management Symposia Paper 17563 and co-author of Paper 18161.
* Managed 40% of WRPS Engineering scope as CAM (October 2018- Present).


BNL Tech, Inc. in Richland, WA
Entry Level Process Engineer
March 2014 - June 2014

Successfully upgraded from staff-augmentation contractor to WRPS employee before end of employment contract:
* Quickly acclimated to tasks and assimilated all necessary information.
* Developed three tank sampling and analysis plans (TSAP) for scheduled sampling events. These plans required advanced planning and coordination to successfully take all samples within provided timeframe.

Washington State University of Pullman, Washington
Temporary Project Engineer, New DLM Data Acquisition and Analysis (NSTE)
May 2011 - December 2013

Spearheaded "New Desktop Learning Module(DLM)" project:
* Tested and analyzed heat exchangers: shell and tube, double pipe, and evaporator(fan-cooled springs).
Performed flow and temperature evaluations.
* Tested and analyzed fluid systems: venturi and orifice.
* Helped write Armfield technical manual: wrote "Operating Procedure" and "Troubleshooting" sections of
"Armfield DLMx Workbook." Edited other sections of book.
* Helped write and edit WSU technical manual: co-author and main editor of "WSU DLM Instructional Manual."
* Coordinate...