KARTHEEK VADLAPATLA
INDUSTRIAL ENGINEERING
303-881-3757
OBJECTIVE
To secure a Spring Co-op /Summer Internship in the field of Industrial Engineering
EDUCATION
CULLEN COLLEGE OF ENGINEERING, UNIVERSITY OF HOUSTON
Houston
Master of Science in Industrial Engineering (GPA: 3.6)
May 2015
Courses: Operations Modeling, Statistics, Simulation, Supply chain Management,
Production planning and control, Facility planning and Design, Lean Manufacturing
Certification: Six Sigma Green Belt
GANDHI INSTITUTE OF TECHNOLOGY AND MANAGEMENT UNIVERSITY
Visakhapatnam, India
Bachelor of Technology in Mechanical Engineering (GPA: 3.5)
May 2012
SOFTWARE PACKAGES
GAMS, Simio, R–Console, @Risk, SQL Server, Solver, VBA, MS Project, Pro-E, CNC Coding and ANSYSC.
EXPERIENCE
Teaching Assistant, University of Houston - Houston August 2013 - Present
• Monitoring and helping students in Advanced Capstone Projects in the following Courses:
INDE 7365 – Lean and Flexible Manufacturing (Graduate Level)
MECT 4365 – Computer Aided Design (Undergraduate Level)
Process Engineering Intern, Hardy Machine and Design – Houston June 2014-August 2014
• Performed Time studies to measure Non-Value Added Time during Setup Operation, and to measure and OEE of CNC Lathe Operators
• Proposed the need for S.M.E.D Techniques to reduce the Setup Time by 50%
• Worked with Operators and Management to implement 5S in the Job shop
• Assessed the Existing layout and designed a new facility layout with Manufacturing Cells
Engineer Trainee, 3R Products & Solutions Inc. – Houston November 2013-January 2014
• Determine technical and quality procurement requirements including Terms of Reference, and generic technical specifications for procurement of goods
• Sourcing, establishing and maintaining Contracts and Software Asset Database as central data point for all contracts and agreements
• Proposed and negotiated purchases
Intern, Associated Engineering Works - Tanuku, India March 2010-August 2010
• Conducted shadowing and interviews with Quoting, Design and Manufacturing departments to gather technical information about Gasifiers design process.
• Assessed existing facility layout, and generated value stream maps to identify waste
• Proposed the need for training Operators on Multiple Operations to decrease to Lead Time by 21%
• Worked with Production Planning Team to implement Two-Bin Kanban System to reduce inventory by 30%
ACADEMIC PROJECTS
Assembly Line Balancing using Simulation...
Login or Register to view the full resume.