carlos

7/28/2014
El Paso, TX

Position Desired

Manufacturing Engineering
Anywhere in the U.S.
Yes

Resume

EXPERIENCE
Dec 14 – Present SISC (Sport Complex) El paso TX
General Manager
• Personnel Handling.
•Lay outs design.
• Implementation of management system.
• Development control systems, Ad management, customer care
and project development

Jul 12 – Feb 2014 Dish Networks (Electronic Devices) El paso TX
Warehouse supervisor
• Charge of the department of materials (warehouses, Receiving, Shipping).
• Supervisor of a production line to Sort RTV product.
• Coordination Stockroom and kanban process

Agu 10 – Dec 10 Newbond (Automotive Plastic) El paso TX
Quality Systems Counselor
• PPAP’S Coordinator.
• Corrective actions development Coordinator (8’D y 5 pasos)
• Coordination and elaboration of APQP.
• Development of procedures for ISO 9000 ver. 2000.

Sep 04 – Agu 10 MACK TECH. (PCB assembly) Cd. Juárez, Chih.
Materials Manager (2009-2010)
• Charge of the department of materials (warehouses, Receipts, Shipping).
• I received the warehouses area Physical Inventory variances 45% and
I improved on only one year in 1%.
Black Belt Coordinator (2006-2009)
• Coordination of cost reduction projects.
• Variability reduction.
• Responsible of the implementation, training and development of the Six Sigma material.
•Elaboration of DOE for SMT.
Quality Engineer (IPC-610D Certification) (2004-2006)
• PPAP’S Coordinator.
• Corrective actions development Coordinator (8’D y 5 pasos)
• Development of strategic projects for the reduction of scrap, defect levels and costs.
• Calibration department Coordinator.
• Creation of Control Plans.
• Development of KPC y KCC matrix.
• Solution to Quality problems in production.
• Coordination and elaboration of APQP.
• Development of procedures for ISO 9000 ver. 2000.
• SPC implementation.
• Validation and Characterization of Equipment and fixtures.
• Process and final Audit.
• Development of selective inspections.
• NPI.
• EC validation.
May 2003 – Sep 2004 Lear (Automotive Harness) Cd. Juárez, Chih
Manufacturing Engineer
• Operation analysis.
• Development of quotations, BOM, Flow charts, Capacity’s, standard.
• Lay outs design.
• Manufacturing process.
• Product Quotations.
Nov 99 – May 2003 HONEYWELL (PCB assembly) Cd. Juárez, Chih
Manufacturing/Process Engineer ( New Products).
• Introduction of new production lines.
• Design of material handling systems.
• Design of the base for the administration of business units (Production,
Manufacturing Eng. Quality Eng. Materials and maintenance).
• Design and implantation of manufacturing cells efficiency increased by 35% personnel
Reduction (20 to 8) and costs.
• Design de Poke Yokes, Fixtures y Accessories.
• Elaboration of work methods.
• Development of quotations, BOM, Flow charts, Capacity’s, st...

Login or Register to view the full resume.