SUMMARY OF EXPERIENCE
Extensive experience in project management, FEED & FEL, detail engineering and construction management. Heavy exposure to mechanical and electrical contracting in oil refineries, chemical plants, steel mills and electrical generating facilities. Additional exposure to waste water treatment plants, environmental compliance projects, energy conservation projects, energy distribution systems, instrumentation and process controls
DETAILED PROFESSIONAL EXPERIENCE
Sun Chemical 2013 to Present
Senior Project Engineer
Responsibilities include the technical evaluation, project funding, engineering, procurement and construction of capital project throughout the Midwest. Specific responsibilities include: management of construction personnel, business plan development, financial projections, detailing scopes of work, cost estimation, planning, scheduling, bid preparation and contract management. Types of project managed include PLC control system upgrades, air and water environmental compliance, energy conservation, process enhancement, a plant wide instrumentation upgrades, NFPA 654 dust explosion mitigation projects.
Ambitech Engineering Corporation 2006 to 2013
Project Manager
Responsible for the commercial and technical performance of contracts to ensure that the project is executed in conformance to the client's specifications in terms of quality, scope, cost and schedule. Specific responsibilities include: providing the single point of contact for both client and internal activities; defining and disseminating the scope of work to the client and all disciplines; establishing and maintaining the overall project budget; developing and maintaining the project schedule; coordinating the engineering, procurement and construction management activities of the project; issuing project status reports; providing direct supervision to all assigned project personnel.
Kennecott Utah Copper
• Provided project management and detail engineering services to create a modularized design of a 1,500 foot, multi level pipe rack for a chemical plant being built in Magna, Utah. This 4,000 ton, sixty modular effort contains 35 miles of pipe and 5 miles of cable trays. This $30,000,000 project required the coordination of multiple engineering companies, several structural steel fabricators, multiple piping subcontractors and vendors.
Dow Corning Midland Plant
• On Site Project Management and FEL development services for a Silicon Metal Ball Mill Grinder expansion project. This $8,000,000 integrated project includes an expansion of the surrounding railroad lines, installation of three elevated 250,000 lb pressurized storage vessels, multiple baghouses, two dense phase pneumatic conveying systems, soil remediation, new control system, and a truck and rail car loading facilities. Third party IPA oversight was integrated into the FEL process.
• On Site Project Management, procurement, and FEL development services for the replacement of a Dowtherm heater, included in the project was the installation of two high temperature pumps, replacement of seven heat exchangers, and an overhaul of the fire protection system in the process unit. This $6,000,000, complex schedule driven project required the coordination of several specialty engineering service contractors and multiple vendors.
Stepan Chemicals Millsdale Plant
• On Site Project Management and Construction Management services for a Betaine storage expansion project. This $6,000,000 fast track integrated project includes soil remediation, new concrete tank farm containment, three 45,000 gallon FRP storage tanks, new PLC based control system, multiple pumps, filters, a truck and rail car loading facilities.
• On Site Project Management and Construction Management services for the metallurgical upgrading of a 40,000 gallon chemical reactor, three heat exchangers and several positive displacement VSD pumps. The new reactor is located in the middle of a congested process area of the plant and required specialized rigging to place the new vessel.
ExxonMobil Joliet Refinery
• Provided Project Management for a High Integrity Protective System (HIPS) for the FCC, Saturated Gas Plant, and Alky Units. This $25,000,000 highly complex Triconex based PLC turnkey project was managed from its’ inception, through the funding process, process engineering, detail engineering, procurement, construction management, operator training and start up.
• Provided Project Management and detail engineering services for the small capital project group whose primary focus is upgrading rotating equipment, new process vessels, heat exchanger replacement, upgrading instrument...
Login or Register to view the full resume.