EDUCATION
Master of Science - Civil Engineering with focus on Structures
University of California, Los Angeles
Graduated December 2010
GPA: 3.03
Graduate Division University Fellowship Award Recipient
Notable Coursework:
Advanced Structural Steel Design
Advanced Reinforced Concrete Design
Advanced Structural Analysis
Structural Response to Ground Motions
Highlighted Project: Special Moment Frame Design of a Ten Story Steel Structure
-Design three special moment frames in the same direction to satisfy only
drift requirements using RAM Structural System.
-Upon satisfying only drift requirements for the three frames, revise only the
central frame to satisfy strong-column weak-beam, detailed strength, and
drift requirements.
-Verify RAM output is accurate through hand calculations.
Bachelor of Science - Structural Engineering
University of California, San Diego
Graduated June 2009
Major GPA: 3.23
Notable Coursework:
Structural Steel Design
Reinforced Concrete Design
Prestressed Concrete Design
Timber and Wood Design
Structural Analysis I & II
Foundation Design
Highlighted Project: Aircraft Cargo Bay Design
-Use SolidWorks to design and model an aircraft cargo bay as a braced cantilever.
-Determine and apply boundary conditions and choose material for the cargo bay.
-Create mesh with CosmosWorks to ensure maximum Von Mises stresses, strains,
and deflections are acceptable.
EXPERIENCE
Kiewit Infrastructure West Co. (Construction Administration)
Los Angeles, CA
Staff Engineer – Interstate 405 Widening ($1 billion cost)
April 2013 – Present
-Compile $1,000 to $4,000,000 cost packages to recoup costs (Time & Materials) from the Los Angeles County Metropolitan Transportation Authority (LACMTA) for the I-405 Sepulveda Pass Widening Project including lateral wall construction and relocation of unmapped utilities.
-Use Microsoft Excel to create Work Expense Summary Sheets to identify Labor,
Equipment, Material, and Subcontractor costs being submitted to LACMTA.
-Review LACMTA rejected costs and determine whether or not the specified costs are billed to the correct operation (Comment Resolution).
-Interface directly with the estimating department and field engineer to identify scope of work of all charges to Retaining Walls 1720, 1730, and 1746, located adjacent to the northbound Sunset on and off-ramps. We removed the work covered under contract from the cost package and provided litigation support to project directors and our department head.
-Produce weekly Time and Materials cost package status reports using Excel tables and graphs to update project supervisors on the cost recovery progress.
Holguin, Fahan & Associates, Inc. (Environmental Science)
Redlands, CA
Assistant Engineer
April 2012 – March 2013
-Condu...
Login or Register to view the full resume.