Shane

6/12/2015
Nashville, TN

Position Desired

Civil Engineering
Nashville, TN
Yes

Resume

EXPERIENCE
Bowen Engineering Corporation Indianapolis, IN
Superintendent May 2015 to present
Tennessee American Water Citico Station WTP – Chattanooga, TN ($12M) May 2015-present
 Lead carpenter, pipefitter, and labor crews in pouring concrete and installing process pipe and equipment.
 Utilize crane charts for proper sizing and location of cranes for project uses.
 Manage electrical and masonry subcontractors through critical path of project schedule.

Project Engineer July 2008 to April ‘15
Tennessee American Water Citico Station WTP – Chattanooga, TN ($12M) May 2014-April ‘15
 Assist with concrete form work selection and schedule/supervise all aspects of concrete pours.
 Review rebar and equipment shop drawings for conformance to project plans and specs.

Ft. Belvoir Water Main Replacement – Fort Belvoir, VA ($12M) Dec 2012-Apr 2014
 Led pre-planning efforts for Area 300 section of the project including building the schedule, quantity takeoff, and subcontractor bid process.
 Manage subcontractor and worked with owner to provide constant communication about project status and control change order items.

AEP Clifty Creek FGD – Madison, IN ($60M) Jan 2012-Nov 2012
 Reviewed specifications, performed quantity take-off and purchase material for mechanical portion of project, including writing Purchase/Change Orders.
 Worked with owner, engineer, and craftsmen to develop solutions to project issues involving fiberglass reinforced plastic and stainless steel pipe systems.
 Wrote RFI’s to document project issues.
 Coordinated Lock Out/Tag Out procedures between plant clearance personnel and crew foremen.
 Supported several superintendents to manage about 180 pipefitters.

TVA Kingston Dry Fly Ash Conversion – Harriman, TN ($40M) Feb 2011-Dec 2011
 Sent drawing packages and received quotes from multiple vendors for the supply of fabricated carbon steel pipe material.
 Documented project issues and scope changes being utilized in the claim process.
 Reviewed timecards to ensure the proper charge codes were used, including codes for extra work and rework.
 Communicated with multiple vendors to purchase small tools and consumables at lowest cost to the project.

TVA John Sevier PEMB Installation – Rogersville, TN ($6M) Aug 2010-Nov 2011
 Reviewed submittal packages for electrical, mechanical, and civil subcontractors.
 Coordinated schedule, project issues, and change management with the electrical, mechanical, and civil subcontractors.
 Documented daily issues to strengthen the ongoing claim negotiation due to delays and interferences from prime contractor.
...

Login or Register to view the full resume.